Combined synopsis and solicitation, total small business set-aside
673CS R1 NORTH UPS
FA500024Q0055
Department of the Air Force, FA5000 673 Cons PKB. Electronic and Precision Equipment Repair and Maintenance.
Response deadline
September 6, 2024 at 6:00 PM EDT
Closed 741 days ago. Posted September 3, 2024, first published August 15, 2024. Scheduled to archive September 21, 2024.
Description
As published on SAM.gov.
03 Sep 2024- Added Q&A for vendors to ba able to complete their quotes 20 Aug 24 - Added a wiring diagram and investigation report with battery information The Government intends to Replace end-of-life batteries supporting R1 North ALMR site. R1 North provides line of sight communications capabilities to DOD and state agencies supporting JBER and Anchorage. Services supported include emergency services, base security, range control and base operations. Currently if power is lost services provided could be interrupted and equipment damaged. The government intends to establish a firm-fixed price contract for the following:
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and provide one time service of onsite Eltek Uninterruptible Power Supply (UPS). These services shall include any equipment, wiring, or infrastructure to ensure the Contractor's proposed solution is compatible with the Government's current infrastructure without additional Government expense. The Contractor shall follow all Federal Communications Commission (FCC), Public Utility Commission (PUC), Department of Defense (DoD), AF, and industry standards for this requirement.
1.2 SPECIFIC REQUIREMENTS: Listed below is a synopsis, please see PWS for full requirements 1. New Batteries a. Remove and dispose of current batteries per EPA standards. b. Provide and install 48 sealed VRLA batteries, utilizing proper torque values (where applicable). 2. Visually inspect conditions and appearance of the following:
a. Connection terminals inter cell/battery connectors, cables and associated hardware.
b. Cell/battery covers, containers, and post seals.
c. Battery racks or cabinets and associated components and hardware.
d. Cell/battery jar or cover, noting any excessive distortion. 3. Perform cleaning of all accessible surfaces as required. 4. Conduct the following Inspections:
a. Inspect all printed circuit board connections for cleanliness, swab contacts if necessary.
b. Inspect all power connections for signs of overheating c. Inspect all subassemblies, bridges and legs for signs of component defects or stress d. Inspect all DC capacitors for signs of leakage e. Inspect all AC capacitors for signs of leakage f. Inspect and inventory all customer-owned spare parts g. Inspect for, and perform as required, any open engineering changes 5. Reporting of Battery Update Visit: a. The technician(s) will issue the customer a report summarizing the work that was performed, condition of the battery and identifying any critical issues before leaving the customer's site.
6. A Field Activity Report containing observations, conditions, and recommendations will be sent to the customer within 5 business days. The field report shall consist of both manufacture and actual parameters for the following areas plus actual service performed: a. Internal Operating Parameters i. DC Ground Detection Offset (if applicable) ii. Inverter leg current average balance (if applicable) iii. Output filter current average phase balance iv.
Rectifier bridge current average leg balance v. AC Protection settings are checked vi. DC Protection settings are checked vii. Input and Output Frequency and Voltage Bandwidth settings are checked viii. Verify DC filter capacitance ix. Verify AC tank and trap filter capacitance x. Power Supply voltages and waveforms xi. Update UPS firmware as necessary b. External Operating Parameters i. System Input Voltages (all phases) ii. System Input Currents (all phases) iii.
DC Charging Voltages (float and equalize), record settings, adjust to nominal iv. Rectifier phase on and walk up Scope of Work v. Inverter phase on and walk up vi. Adjust all panel meters to measured values vii. System Bypass Voltages (all phases) viii. Manual and UV Transfer Testing, verify uninterrupted transfer waveform (if applicable) c. Outage simulation, and battery capability testing, and verify charger current limit.
Environmental Parameters i. UPS area ambient temperature and condition of ventilating equipment ii. General Cleanliness of UPS Power Module iii. General Cleanliness of UPS area iv. Replace air filters as applicable and necessary (parts if required are included at no charge under service agreements with full parts coverage, otherwise billable) v. Clean outside of UPS including control panel/CRT screen
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 15, 2024
Combined synopsis and solicitation
Due September 6, 2024 at 6:00 PM EDT. SAM.gov, notice 95bd4f2756014830abb9f643f60a4afe
August 20, 2024
Combined synopsis and solicitation
Due September 6, 2024 at 6:00 PM EDT. SAM.gov, notice 8bb22152b8cf4357afc0e77359594fc1
September 3, 2024
Combined synopsis and solicitation
Due September 6, 2024 at 6:00 PM EDT. SAM.gov, notice bcf58674298143ef9a00bf6d3a228622
Points of contact
- Robert Briggsrobert.briggs.13@us.af.mil9075523969
- Doung Tan Nguyendoung_tan.nguyen@us.af.mil9075525446
Also open from this buyer
- NAF PAX BusesCombined synopsis and solicitationSmall businessNAICS 336211AlaskaELMEF60232Closes tomorrowSep 18
- Local & Long-Distance Telecommunications Service - Joint Base Elmendorf-Richardson, Alaska - Amendment 1SolicitationNAICS 517111AlaskaFA500026Q0047Closes in 4 daysSep 21
- Bobcat Toolcat Combo SolicitationCombined synopsis and solicitationSmall businessNAICS 333120AlaskaFA500026Q0067Closes in 4 daysSep 21
- JBER E-3 Sentry On Board Spare (OBS) Storage KitsCombined synopsis and solicitationSmall businessNAICS 336413AlaskaFA500026Q0065Closes in 7 daysSep 24