Skip to content
Abierto

Presolicitation

Restoration of Northwest Storm Drain Infrastructure

FA481962R8027

Department of the Air Force, FA4819 325 Cons PKP. Water and Sewer Line and Related Structures Construction.

Response deadline

February 18, 2026 at 3:30 PM EST

Closed 211 days ago. Posted February 18, 2026, first published February 6, 2026. Scheduled to archive February 18, 2026.

Description

As published on SAM.gov.

Purpose of this task order is to repair existing stormwater infrastructure (drainpipe and inlet structures) at selected areas within the Tyndall AFB main airfield. The existing stormwater infrastructure is in degraded condition and needs to be replaced to provide proper drainage and mitigate safety hazards associated with sinkholes noted by maintenance personnel on base. In accordance with FAR 36.204(g), the magnitude for this project is between $5,000,000 and $10,000,000.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 6, 2026

    Presolicitation

    Due February 23, 2026 at 1:00 PM EST. SAM.gov, notice 6609caae38f847b9b276429b8793d034

  2. February 18, 2026

    Presolicitation

    Due February 18, 2026 at 3:30 PM EST. SAM.gov, notice 05cbec5645f3435c84d9334a492cf4ed

Points of contact