Skip to content
Abierto

Presolicitation, total small business set-aside

Restore Storm Drain Infrastructure-Northeast

FA481926R8306

Department of the Air Force, FA4819 325 Cons PKP. Water and Sewer Line and Related Structures Construction.

Response deadline

February 19, 2026 at 1:40 PM EST

Closed 210 days ago. Posted February 19, 2026, first published February 6, 2026. Scheduled to archive February 23, 2026.

Description

As published on SAM.gov.

Purpose of this task order is to repair existing stormwater infrastructure (drainpipe and inlet structures) at selected areas within the Tyndall AFB main airfield. The existing stormwater infrastructure is in degraded condition and needs to be replaced to provide proper drainage and mitigate safety hazards associated with sinkholes noted by maintenance personnel on base. In accordance with FAR 36.204(g), the magnitude of this project is estimated to be between $5,000,000 and $10,000,000.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 6, 2026

    Presolicitation

    Due February 23, 2026 at 1:00 PM EST. SAM.gov, notice 3b8764058da64df58bdda784adb99fd9

  2. February 19, 2026

    Presolicitation

    Due February 19, 2026 at 1:40 PM EST. SAM.gov, notice 90877172be4348c581cada1b7e2614ca

Points of contact