Skip to content
Abierto

Sources sought, total small business set-aside

Langley AFB Accessible Playground

FA480025QA081

Department of the Air Force, FA4800 633 Cons PKP. Sporting and Athletic Goods Manufacturing.

Response deadline

July 8, 2025 at 4:00 PM EDT

Closed 436 days ago. Posted July 1, 2025, first published June 26, 2025. Scheduled to archive July 23, 2025.

Description

As published on SAM.gov.

Joint Base Langley-Eustis (JBLE), Virginia anticipates a requirement for Accessible Playground Procurement and Installation that is being considered under a small business set-aside program at Langley AFB. The North American Industry Classification Systems (NAICS) Code proposed 339920. The size standard for this NAICS is 750 Employees.

INSTRUCTIONS: In response to this Sources Sought, contractors must submit one conceptual plan for a 10,500 square foot assessable playground in addition to a Rough Order of Magnitude (ROM). The ROM should reflect the anticipated price range for providing playground equipment, site design, and any associated services such as delivery and installation. This estimate is for planning purposes only and does not constitute a formal proposal or binding offer.

Base representatives will utilize conceptual plans to inform and finalize the forthcoming official solicitation and Statement of Work (SOW). Please see the attached draft SOW and Sources Sought document for full details. Responses shall be emailed to SrA Brittney Osborne and Ms. AnnMarie Shields. RESPONSES ARE DUE NO LATER THAN 1600 EST on 7 July 2025. This paragraph is for informational purposes ONLY. This Sources Sought does not constitute an official solicitation.

Upon formal solicitation, contractor will be required to quote for all services, labor, materials, equipment, transportation and supervision to procure and install a 10,500 square foot rectangular Accessible Playground per the preliminary site plan located on JBLE-Langley – See Exhibit A for preliminary location. The contractor will be required to procure and install all equipment including all necessary site work to provide a complete and usable accessible playground.

This will be a turn-key requirement from submitting the approved conceptual design to the completion of the playground, including prepping the pad to accept the new playground equipment. The contractor will detail all site work included in their proposal. Any exclusions should be specifically denoted as well. The ADA sidewalk and parking lot stripping are excluded from this requirement.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 26, 2025

    Sources sought

    Due July 7, 2025 at 4:00 PM EDT. SAM.gov, notice 500c06be7c974906b0aff4412d32bc87

  2. July 1, 2025

    Sources sought

    Due July 8, 2025 at 4:00 PM EDT. SAM.gov, notice 46c31fdc04044813a25e548710fd3203

Points of contact