Solicitation, total small business set-aside
Bldg 5016 Chiller Condenser Replacement
FA466124R0007
Department of the Air Force, FA4661 7 Cons CD. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
February 2, 2024 at 3:00 PM EST
Closed 1004 days ago. Posted January 30, 2024, first published January 11, 2024. Scheduled to archive February 17, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
41 like it are open now in plumbing, heating, and air-conditioning contractors
- CANCELLATION - NTX Steam Trap Monitoring - CANCELLATION
Department of Veterans Affairs, 257-Network Contract Office 17
SolicitationSDVOSBNAICS 238220Dallas, TX36C25727Q0033Closes in 2 daysNov 4 - NEW - Energy Center Steam Header& Boilers valves, gaskets, and vent replacement
Department of Veterans Affairs, 257-Network Contract Office 17
Sources soughtSDVOSBNAICS 238220Dallas, TX36C25727Q0078Closes in 7 daysNov 9 - CON | Z1DA | REPLACE OR CHILLERS | 580-23-105 | SOLICITATION
Department of Veterans Affairs, 256-Network Contract Office 16
SolicitationSDVOSBNAICS 238220Houston, TX36C25626R0130Closes in 30 daysDec 2
All 41 open in plumbing, heating, and air-conditioning contractors
Description
As published on SAM.gov.
Amendment 0002 - Proposal extended until 01 Feb 2024 02:00 P.M. CST PROPOSAL DUE 02 FEB 2024 02:00 P.M. CST. Evaluation factor added: This requirement is a small-business set-aside and will be evaluated on the basis of Lowest Price Technically Acceptable. In order to be Technically Acceptable, the vendor must submit their itemized quote and must meet all criteria within the Statement of Work, including the specified brand name equipment.
New 6 Attachment: Please see attached for the pictures of the chiller and the electricals.
The Contractor shall provide all labor, equipment, tools, material, supervision, and any other items necessary to properly remove and replace, one (1) Trane chiller, one (1) chilled water pump and all supporting equipment. The contractor shall also, following the same requirements, install one (1) 15-ton Trane chiller). *Trane air cooled water chillers.
The contractor will be required to provide and install one (1) new properly sized chilled water pump and one (1) BAS line starter to operate the chilled water pump(s) properly. Additionally, the chosen line starter must be able to operate, start/stop and monitor using existing facility controls system. Please review the attached Statement of Work, specified brand name, and wage determination. Proposal due date 02 February 2024 a 02:00 P.M. CST Please email the required items to esther.cadena@us.af.mil
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 11, 2024
Solicitation
Due January 25, 2024 at 3:00 PM EST. SAM.gov, notice 863a89d6afb94c798ac8e7e50d5b00d1
January 11, 2024
Solicitation
Due January 25, 2024 at 3:00 PM EST. SAM.gov, notice ed6dd83d7b244514a0c9d80ea8cef37a
January 23, 2024
Solicitation
Due January 25, 2024 at 3:00 PM EST. SAM.gov, notice 437af5dbff1b4a3b94da94fd0a025a29
January 30, 2024
Solicitation
Due February 2, 2024 at 3:00 PM EST. SAM.gov, notice a55164966b9d45038a2e9af59a42a569
Points of contact
- SrA Esther Cadenaesther.cadena@us.af.mil3256962246
- SSgt Maren Quinones-Burgessmaren.quinones-burgess@us.af.mil3256963862