Presolicitation, total small business set-aside, first published as sources sought
Vertical Construction Multiple Award Contract (MAC)
FA4626-26-R-0007
Department of the Air Force, FA4626 341 Cons LGC. Commercial and Institutional Building Construction.
Status
Archived
Posted August 31, 2026, first published February 25, 2026. Scheduled to archive September 15, 2026.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one is not taking offers
184 like it are open now in commercial and institutional building construction
- JB Charleston Multiple Award Construction Contract
Department of the Air Force, FA4418 628 Cons PK
SolicitationNAICS 236220South CarolinaFA441826R0009Closes tomorrowNov 2 - REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO
Department of the Army, W072 Endist Louisville
Sources soughtNAICS 236220Wright-Patterson AFB, OHWright-Patterson Air Force BaseW912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFBCloses tomorrowNov 2 - WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Department of the Air Force, FA8137 AFSC Pzioc
SolicitationWOSBNAICS 236220OklahomaFA813727R0002Closes tomorrowNov 2
All 184 open in commercial and institutional building construction
Description
As published on SAM.gov.
PRIMARY MAC - The purpose of the Vertical Construction MAC is to provide design-bid-build and design-build construction services for a broad range of military renovation and construction projects, primarily in support of the Malmstrom AFB installation, Launch Facilities (LF), and Missile Alert Facilities (MAFs). Work performed under Vertical Construction MAC orders may include but is not limited to the repair, renovation, alteration, and/or demolition of various vertical structures, building equipment & systems (plumbing, electrical, HVAC, fire suppression, etc.), and interior/exterior finishes. The initial ordering period is projected to be five (5) years with a two (2) year option year (potential total contract length of seven (7) years) and will have an estimated overall contract ceiling of $99,999,999.99.
SEED PROJECT – The proposed initial task order to be awarded under the Vertical Construction MAC is the DSN/CSN Repair Bldg. 1082 HVAC project on Malmstrom AFB, MT. This project consists of developing conceptual documents for two (2) courses of action (COAs) to provide backup cooling and humidification along with a rough order of magnitude for each COA. The COAs should include HVAC components similar to the existing system. The Government will select one (1) COA to take to the 65% design and develop into a 100% Type B design. The seed project period of performance is 242 calendar days after receipt of notice to proceed (NTP). Construction may commence after acceptance of the 65% design.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Vertical MAC Pre-Sol Notice.pdf121 KB, August 31, 2026
- Vertical MAC Sources Sought.pdf127 KB, February 25, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 25, 2026
Sources sought
Due March 12, 2026 at 4:00 PM EDT. SAM.gov, notice 03faa399ae2c4f2daee3e98999444533
2 revisions on SAM
- August 31, 2026: publish, presolicitation
- February 25, 2026: publish, sources sought
August 31, 2026
Presolicitation, originally sources sought
SAM.gov, notice 30410a5355d243899c07074f04277831
2 revisions on SAM
- August 31, 2026: publish, presolicitation
- February 25, 2026: publish, sources sought
Points of contact
- Cody Babineczcody.babinecz@us.af.mil4067314608
- Colleen T. Goadcolleen.goad.1@us.af.mil4067313473