Skip to content
Abierto

Solicitation, total small business set-aside

PREMISE WIRING B145

FA462626Q0009

Department of the Air Force, FA4626 341 Cons LGC. Electrical Contractors and Other Wiring Installation Contractors.

Response deadline

April 24, 2026 at 3:00 PM EDT

Closed 145 days ago. Posted April 17, 2026, first published March 20, 2026. Scheduled to archive May 9, 2026.

Description

As published on SAM.gov.

Engineer, furnish, install, and test (EFI&T) a premises wiring upgrade to new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145 (B145) at Malmstrom AFB, MT. The Cat-6 and OM4 MM fiber drop layouts are shown in Attachment A, Layout Drawings. The upgrade shall include installation and replacement of communications (comms) racks/cabinets, installation of new AC power with power distribution unit (PDU), and comms rack/cabinet grounding. The Contractor shall remove all existing outdated and abandoned-in-place (AIP) Cat-3/5 and MM fiber cabling, along with any residual materials, from the building and dispose of them accordingly.

Amendment 0001:

1. A site visit has been scheduled for April 7th 2026 at 10:00 MST. The site visit will begin at the contracting office front lobby located 7015 Goddard Dr., Bldg. 145. Malmstrom AFB, MT 59402.

2. To Extend the Solicitation from April 6th 2026 to April 10th 2026 1:00 PM MST RFIs answered How many existing drops can be taken out of service while new cabling is being installed? This will have to be a phased plan with sections being done at a time. We have a pretty good idea on how we want it done, but we are open to working with the contractor to find the best solution. Please clarify the description “new/replacement”.

Is an existing drop already in this location and we are removing the existing cabling or is this a totally new location? If some are new and some are replacement, what is the count of each? 90% will removing and replacing what is already there. There is a few area that require new drops to be cut in from existing cabling that is running out in the open. Section 4.7.3 mentions SIPRNet. We find no SIPRNet locations called out in the drawings. Will there be any SIPRNet locations?

Figure ATT-2 (the last page) shows 8 SIPR drops and that they all will be redirected to CEL-2. Section 4.7.16 Generally, is the amount of cable known to exist about equal to the number of new cables to be installed or is there a large amount of previously abandoned cable to be removed? It is not equal as I know there is a room full of 66 blocks and cooper that will need to be pulled. It should state somewhere that all unused copper will be removed from the building.

Is there existing backbone to the new rack locations? Is the contractor responsible for terminating, placing in patch panels, patch cords, etc.? There is no new rack location. It will be racking replacements and there is already a backbone there. Yes, for terminating to the patch panel. We will patch into the switch. See Attached SOO for full details.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 20, 2026

    Solicitation

    Due April 6, 2026 at 3:00 PM EDT. SAM.gov, notice a691c56dba2c48a585cb4e7ecad0823f

  2. March 30, 2026

    Solicitation

    Due April 10, 2026 at 3:00 PM EDT. SAM.gov, notice 45f9f8601430421c85b59823c35cdfab

  3. April 2, 2026

    Solicitation

    Due April 10, 2026 at 3:00 PM EDT. SAM.gov, notice 32ea755f8a4741d49b7f67e22c9927a0

  4. April 8, 2026

    Solicitation

    Due April 10, 2026 at 3:00 PM EDT. SAM.gov, notice 412c8b27341441ca8e98b3be9a217284

  5. April 9, 2026

    Solicitation

    Due April 17, 2026 at 3:00 PM EDT. SAM.gov, notice 455dedcb13fd47e5bc0423edbaac5435

  6. April 9, 2026

    Solicitation

    Due April 10, 2026 at 3:00 PM EDT. SAM.gov, notice fe77db5d44544bd686bb69311f1fc2d8

  7. April 17, 2026

    Solicitation

    Due April 24, 2026 at 3:00 PM EDT. SAM.gov, notice a82c55beb32549c9b6a5a8d4210eed52

Points of contact