Skip to content
  • 6,807 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Solicitation, total small business set-aside

B369 Boiler

FA460026Q0051

Department of the Air Force, FA4600 55 Cons PKP. Power Boiler and Heat Exchanger Manufacturing.

Response deadline

June 17, 2026 at 12:00 PM EDT

Closed 137 days ago. Posted June 3, 2026. Scheduled to archive July 2, 2026.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one closed in 2026

10 like it are open now in power boiler and heat exchanger manufacturing

  • COOLER,FLUID,INDUST

    Defense Logistics Agency, DLA Troop Support

    Combined synopsis and solicitationNAICS 332410Anywhere in the USSPE8E827T0276
    Closes in 2 daysNov 2
  • BAFFLE,FLUID COOLER,IN

    Defense Logistics Agency, DLA Troop Support

    Combined synopsis and solicitationSmall businessNAICS 332410Anywhere in the USSPE8E827T0278
    Closes in 2 daysNov 2
  • CORE ASSEMBLY,FLUID HE

    Defense Logistics Agency, DLA Troop Support

    Combined synopsis and solicitationNAICS 332410Anywhere in the USSPE8E827T0349
    Closes in 9 daysNov 9

All 10 open in power boiler and heat exchanger manufacturing

Description

As published on SAM.gov.

The scope of work is to provide a new NTI model LX-600 boiler; 600,000 BTU input, with ASME SS heat exchanger, floor-mount, factory-provided ASME relief valve, at least 4 to 1 turn down, 95% combustion efficiency, 4” exhaust vent and 4” fresh air intake, with outdoor sensor, CSD-1 controls, integrated electronic controller with touch screen access, and factory-installed condensate trap and included condensate drain kit.
The hydronic gas boiler must be at least 600 MBH capacity, with at least 4:1 turndown on natural gas, and dimensions no larger than 24"wide x 47.5"deep(long) x 55" high, with water (2") and gas (1") connections along the left-hand length side and air inlet/exhaust (4") connections along the top or left-hand length side.
The Contractor shall provide at least a 1-year comprehensive warranty on all new materials.

The government will only accept quotes providing a product in accordance with the attached restricting competition memo.

Quotes due 17 June 2026 11:00 AM CST

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 3, 2026

    Solicitation, originally sources sought

    Due June 17, 2026 at 12:00 PM EDT. SAM.gov, notice 31e8a7f0c78b4c4c86e15a3adf3ea858

    2 revisions on SAM
    • June 3, 2026: publish, solicitation
    • April 30, 2026: publish, sources sought

Points of contact