Sources sought
Prep and Paint Heritage Park Flagpole and Base
FA4460_PAINT_HERITAGE_PARK
Department of the Air Force, FA4460 19 Cons Pka. Painting and Wall Covering Contractors.
Response deadline
May 13, 2024 at 5:00 PM EDT
Closed 910 days ago. Posted May 3, 2024. Scheduled to archive May 28, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
2 like it are open now in painting and wall covering contractors
- NWS Forecast Office Pittsburgh, PA Window Film, Interior Painting, and Generator Sound Barrier Wall Repair
National Oceanic and Atmospheric Administration, Department of Commerce NOAA
PresolicitationSmall businessNAICS 238320Pennsylvania26-3943Closes in 5 daysNov 14 - FCC Terre Haute Bus Center Roof and Paint Materials NOV FY26
Federal Prison System / Bureau of Prisons, Usp Terre Haute
Combined synopsis and solicitationSmall businessNAICS 238320Anywhere in the US15B41827Q00000001Closes in 11 daysNov 20
Description
As published on SAM.gov.
Little Rock AFB (LRAFB) is conducting market research to identify potential sources that may possess the expertise, capabilities, and experience to meet the requirements to conduct the preparation and repaint of the Heritage Park Flagpole and concrete base at Little Rock AFB, Arkansas. The contractor shall perform full prep of the metal flag pole and the concrete base surrounding the pole. Prep includes sanding or sand blasting the pole to eliminate any rough areas or chipped areas.
Concrete base area is 43 feet 6 inches in diameter, prep includes sealing or repairing any cracks in the concrete. Primer any exposed bare metal or concrete or chipped area so paint will adhere. Paint flagpole a gloss white and the truck at the top a golden color. Protect any exposed cables or pulleys from being over sprayed. Concrete base paint is red on the center 8 feet in diameter, white star on the next section our and blue field on the outside of the circle. Follow the existing layout pattern.
Paint and primer used must the type to adhere to the material being painted (metal or concrete). SDS’s will be provided on all materials used in the process prior to start of the work. Clean up of the work area and disposal of all waste is the responsibility of the contractor. Equipment rental such as lifts, or painting equipment and all material used in the project are the responsibility of the contractor to provide.
Contractor shall furnish and replace the protective halyard stoppers to protect the paint on the pole from chipping during high winds. Below is a document containing a description of the preparation and repaint of the Heritage Park Flagpole and concrete base requirement and a Contractor Capability Survey, which allows you to provide your company’s capability.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 3, 2024
Sources sought
Due May 13, 2024 at 5:00 PM EDT. SAM.gov, notice 5a4fc19de7864a1a9a312056695ad506
Points of contact
- Arrunh Boegerarrunh.boeger.1@us.af.mil5019873844