Combined synopsis and solicitation, total small business set-aside
B156 Fence Removal and Extension
FA4460-24-Q-0271
Department of the Air Force, FA4460 19 Cons Pka. Other Fabricated Wire Product Manufacturing.
Response deadline
August 26, 2024 at 5:00 PM EDT
Closed 797 days ago. Posted August 14, 2024. Scheduled to archive September 10, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
7 like it are open now in other fabricated wire product manufacturing
- PIN,QUICK RELEASE
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationNAICS 332618Anywhere in the USSPE4A627T6630Closes in 2 daysNov 2 - SLING,MULTIPLE LEG
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationHUBZoneNAICS 332618Anywhere in the USSPE8EE27T0225Closes in 2 daysNov 2 - WIRE ROPE ASSEMBLY,SIN
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationHUBZoneNAICS 332618Anywhere in the USSPE7L427T0479Closes in 2 daysNov 2
Description
As published on SAM.gov.
The contractor shall provide all qualified personnel, transportation, tools, equipment, materials and services required remove, furnish and install an extension to the existing chain link fence at building 156 on Little Rock AFB, AR 72099. The contractor shall accomplish all services below to meet the requirements of this Performance Work Statement (PWS). Work shall be in compliance with all Federal, State and local regulations, codes and license requirements.
Work shall be accomplished within 60 days of material arrival. Estimated delivery date of material is required to be sent to the Contracting Officer Representative (COR) within 10 days of contract award. Contractor must remove required fence to expand and install fully operational chain link fence matching in size and material to the existing fence surrounding the fire training area. Extend the fence line approximately 853 linear feet. Remove the 194' section of fence on the western most edge.
Remove the fence surrounding the propane tank. Installation shall closely match existing fence in height and post spacing. Refer to Appendix B for plan. Posts shall be anchored in a minimum 12 inch wide by 24 inch deep concrete footing. Fence shall have a three-strand climb resistant top to match existing fence. Contractor must relocate the existing 16' gate to the entrance and the existing 10' gate would be relocated to the east edge of the expansion. Refer to Appendix B for plan.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 14, 2024
Combined synopsis and solicitation
Due August 26, 2024 at 5:00 PM EDT. SAM.gov, notice 17114b0e580c4d078d385c59f78dd716
Points of contact
- Ethan Lenoirethan.lenoir.1@us.af.mil501-987-1028
- Shawn DostieShawn.dostie@us.af.mil5019873443