Sources sought
60 MXS, Fabrication Flight Parts Manufacturing
FA442726QZ055
Department of the Air Force, FA4427 60 Cons LGC. All Other Miscellaneous Fabricated Metal Product Manufacturing.
Response deadline
July 15, 2026 at 3:00 PM EDT
Closed 109 days ago. Posted July 1, 2026. Scheduled to archive July 30, 2026.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2026
61 like it are open now in all other miscellaneous fabricated metal product manufacturing
- Fabricated Components for the SR Embedded Floor Plates for the ALS-U Project
Department of Energy, Berkeley Natl Lab - DOE Contractor
Combined synopsis and solicitationNAICS 332999Anywhere in the USAA-2027-02Closes in 11 daysNov 12 - Hose Assembly, Nonmetallic
Defense Logistics Agency, DLA Land and Maritime
Presolicitation8(a)NAICS 332999Anywhere in the USSPE7MX26RX064Closes tomorrowNov 2 - HOSE ASSEMBLY,NONMETAL
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 332999Anywhere in the USSPE7M427T1635Closes in 2 daysNov 2
All 61 open in all other miscellaneous fabricated metal product manufacturing
Description
As published on SAM.gov.
This is a Sources Sought notice for the requirements below for Market Research purposes. Please note this is not a request for quotes.
60 MXS, Fabrication Flight, is looking to expand their manufacturing capability:
These post-processing requirements are our primary manufacturing bottlenecks; while we can machine the parts, our lack of required infrastructure prevents us from meeting blueprint specifications and causes the rejection of -107 and -202 engineering requests.
Below are the required capabilities tied to their governing specifications.
1. Anodize & Dichromate Sealing (Immediate Test Case)
- Requirement: MIL-A-8625 Type II (Class I) & Type III (Class I & II)
2. Automated Shot Peening
- Requirement: ASTM 2430, Lockheed STP51-501, Boeing SOPM 20-10-03
- Limitation: Requires automated intensity-control and media-sorting equipment. Manual roto-peening is structurally impractical for large surface areas.
3. Thermal Spray Coatings (Tungsten Carbide – Cobalt)
- Requirement: BMS10-67 Type I via Boeing BAC5851 Class 1 (Plasma) or Class 2 (HVOF)
- Limitation: Travis AFB lacks the high-velocity oxygen fuel / plasma thermal equipment and specialized environmental spray booths required for this application
4. Pre-Penetrant Alkaline Acid Etch
- Requirement: Lockheed STP53-201 / Boeing SOPM 20-20-02 (Sodium Hydroxide or Flicks etch)
- Limitation: Critical post-machining process to remove 0.0002” – 0.0004” of smeared metal to allow for accurate NDI crack detection
Goal: To establish a possible Blanket Purchase Agreements (BPAs) for these four distinct processes.
If your company is capable of fulfilling the required effort, notify the POC.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 1, 2026
Sources sought
Due July 15, 2026 at 3:00 PM EDT. SAM.gov, notice e5e947faa92b4488bcb1c9897f22a35f
1 revisions on SAM
- July 1, 2026: publish, sources sought
Points of contact
- Phillip Manwaringphillip.manwaring@us.af.mil707-424-8927