Description

As published on SAM.gov.

The 628th Civil Engineer Squadron (CES) requires a new Facility-Related Control System (FRCS) for generator monitoring. The current system is non-existent and needs to be a modern, secure, on-premise solution that meets all current Air Force cybersecurity standards. The primary objective of this project is to procure and install a new, on-premise generator monitoring system and replace the associated network hardware to ensure continuous, secure, and reliable operational oversight. All Questions are due no later than 2 pm EST 26 August 2026. Please read and follow any instructions contained in clause 52.212-1. Also, be mindful of evaluation criteria under clause 52.212-2.

NOTE: Offeror is required to submit a priced Comprehensive Bill of Materials (BOM) that identifies all equipment, components, parts and materials required to complete the installation and meet the requirements. Furthermore, the BOM shall include item descriptions, quantities, unit prices, manufacturer names and model numbers (as applicable). The information provided must be sufficient to verify technical compliance and evaluate the completeness of the proposed solution.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 21, 2026

    Solicitation, originally presolicitation

    Due September 3, 2026 at 2:00 PM EDT. SAM.gov, notice 9a4303bae4a34a118735664a6b35d2f9

  2. August 31, 2026

    Solicitation

    Due September 3, 2026 at 2:00 PM EDT. SAM.gov, notice 07de8b0dcf794af0b188d0978f22e23b