Skip to content
Abierto

Solicitation

FY25 Concert Production Support

F4199925Q0058

Department of the Air Force, FA9000 Af Naf Po. Arts, Entertainment, and Recreation.

Response deadline

May 8, 2025 at 6:00 PM EDT

Closed 497 days ago. Posted April 30, 2025. Scheduled to archive May 23, 2025.

Description

As published on SAM.gov.

The 2025 Entertainment Program is scheduled to begin on 1 Aug 2025 and continue through 30 Sep 2025. Twelve (12) AF installations are scheduled to receive concerts. The Contractor will coordinate in advance with all artists scheduled to perform concerts and identify total requirements for providing production support for each concert.

The Contractor shall then meet with the AFE Technical Director to ensure ability to support identified requirements and validate interfacing of AFE and Contractor equipment necessary to support each requirement. The Contractor shall provide all technical equipment, personnel and transportation listed in Part II. AFE will provide their equipment identified as well as any additional equipment required to meet artist’s production riders not listed to be supplied by the Contractor.

The Contractor supplied technical personnel must possess the skill and professional expertise to be fully capable of transporting, setting up, operating and tearing down the complete Audio, Video, Lighting and Staging systems identified within this Statement of Work.

They must be capable of passing standard base entry security requirements and adhere to all host base protocols.The 2025 Entertainment Program is scheduled to begin on 1 Aug 2025 and continue through 30 Sep 2025. Twelve (12) AF installations are scheduled to receive concerts. The Contractor will coordinate in advance with all artists scheduled to perform concerts and identify total requirements for providing production support for each concert.

The Contractor shall then meet with the AFE Technical Director to ensure ability to support identified requirements and validate interfacing of AFE and Contractor equipment necessary to support each requirement. The Contractor shall provide all technical equipment, personnel and transportation listed in Part II. AFE will provide their equipment identified as well as any additional equipment required to meet artist’s production riders not listed to be supplied by the Contractor.

The Contractor supplied technical personnel must possess the skill and professional expertise to be fully capable of transporting, setting up, operating and tearing down the complete Audio, Video, Lighting and Staging systems identified within this Statement of Work. They must be capable of passing standard base entry security requirements and adhere to all host base protocols.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 30, 2025

    Solicitation

    Due May 8, 2025 at 6:00 PM EDT. SAM.gov, notice f62afc1d0839451999cababa90204a8a

Points of contact