Skip to content
  • 6,984 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, women-owned small business set-aside

56 CS FOC to Flightline and Wx Equipment, Luke AFB

F3YCFA6173AC01

Department of the Air Force, FA4887 56 Cons CC. Fiber Optic Cable Manufacturing.

Offers due

November 9, 2026 at 4:00 PM EST

28 days from now. Posted October 8, 2026, first published October 7, 2026.

Get an email when this is amended, when the deadline moves and when it is awarded.Watch it

Similar, open now

Description

As published on SAM.gov.

This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059). Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, or material will be provided by the government. All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment.

See attached Solicitation and supporting documents for additional information. 

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. October 7, 2026

    Combined synopsis and solicitation

    Due November 9, 2026 at 4:00 PM EST. SAM.gov, notice e6b66c9d55514df182a688ba5b74d284

    1 revisions on SAM
    • October 7, 2026: publish, combined synopsis and solicitation
  2. October 8, 2026

    Combined synopsis and solicitation

    Due November 9, 2026 at 4:00 PM EST. SAM.gov, notice f5187dd89d4f41588570b47c98c75637

    2 revisions on SAM
    • October 8, 2026: publish, combined synopsis and solicitation
    • October 7, 2026: publish, combined synopsis and solicitation

Points of contact