Combined synopsis and solicitation, women-owned small business set-aside
56 CS FOC to Flightline and Wx Equipment, Luke AFB
F3YCFA6173AC01
Department of the Air Force, FA4887 56 Cons CC. Fiber Optic Cable Manufacturing.
Offers due
November 9, 2026 at 4:00 PM EST
28 days from now. Posted October 8, 2026, first published October 7, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Similar, open now
- Market Survey for Procurement of Spares in Support of the Secure Mobile Anti-Jam Reliable Tactical (SMART-T) Program.
Defense Logistics Agency, DLA Land at Aberdeen
Sources soughtNAICS 335921Anywhere in the USDLA-Aberdeen-26-077Closes in 11 daysOct 23 - Market Survey for Procurement of Spares in Support of the Secure Mobile Anti-Jam Reliable Tactical (SMART-T) Program.
Defense Logistics Agency, DLA Land at Aberdeen
Sources soughtNAICS 335921Anywhere in the USDLA-Aberdeen-26-076Closes in 11 daysOct 23 - CABLE ASSEMBLY,FIBE
Department of the Navy, NAVSUP Weapon Systems Support
SolicitationNAICS 335921Anywhere in the USN0038326QHA70Closes in 44 daysNov 25
Description
As published on SAM.gov.
This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059). Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, or material will be provided by the government. All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment.
See attached Solicitation and supporting documents for additional information.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Luke AFB Environmental Guide for Contractors.pdf7.4 MB, October 7, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 7, 2026
Combined synopsis and solicitation
Due November 9, 2026 at 4:00 PM EST. SAM.gov, notice e6b66c9d55514df182a688ba5b74d284
1 revisions on SAM
- October 7, 2026: publish, combined synopsis and solicitation
October 8, 2026
Combined synopsis and solicitation
Due November 9, 2026 at 4:00 PM EST. SAM.gov, notice f5187dd89d4f41588570b47c98c75637
2 revisions on SAM
- October 8, 2026: publish, combined synopsis and solicitation
- October 7, 2026: publish, combined synopsis and solicitation
Points of contact
- Rachel Tilleyrachel.tilley.1@us.af.mil
- Jacqueline C. Arandajacqueline.aranda.1@us.af.mil