Skip to content
  • 6,616 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Presolicitation

Building Automation

F3N0425344A001

Department of the Air Force, FA5613 700 Cons PK. Building Equipment Contractors.

Response deadline

April 14, 2026 at 10:30 AM EDT

Closed 203 days ago. Posted March 30, 2026. Scheduled to archive April 29, 2026.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

Description

As published on SAM.gov.

1.1 DESCRIPTION OF INCIDENTAL SERVICES.
The contractor shall provide a complete building automation system (BAS) including BACnet/IP
based controllers, electric cabinets, sensors and acutuators for the HVAC systems of the
buildings. All work shall conform to standard commercial practices, in accordance with (IAW)
the technical regulations for workplaces, and electrical TUV/VDE requirements. This shall
include testing and balancing of all controllers and the new application.
In phase 1 an existing building will be renewed, and new HVAC systems and the BAS will be
installed. In phase 2 a new building will be built and connected to the existing building.
The contractor shall be responsible for:
1.1.1 Delivery of field devices Sensors and actuators for phase 1
- heating circuit
- hot water preparation
- Utilities room
- Telecom room
1.1.2 Delivery of electric cabinet including building automation system for phase 1
- heating circuit
- hot water preparation
- Utilities room
- Telecom room
- Connection to air handling unit
- Connection to metering
- Connection to cooling units
- hygienic rinse
- various fault messages

1.1.3 Delivery of Software program specially designed for the building automation system
for phase 1
- heating circuit
- hot water preparation
- Utilities room
- Telecom room
- Connection to air handling unit
- Connection to metering
- Connection to cooling units
- hygienic rinse
- various fault messages
1.1.4 Commissioning and as built documentation for the building automation system for
phase 1
- heating circuit
- hot water preparation
- Utilities room
- Telecom room
- Connection to air handling unit
- Connection to metering
- Connection to cooling units
- hygienic rinse
- various fault messages
1.1.5 Delivery of field devices Sensors and actuators for phase 2
- heating circuit vehicle bay
- Utilities room phase 2
1.1.6 Delivery of electric cabinet including building automation system for phase 2
- heating circuit vehicle bay
- Utilities room phase 2
- Connection to ventilation system vehicle bay
- Connection to the control system of the doors
- various fault messages
1.1.7 Delivery of Software program specially designed for the building automation system
for phase 2
- heating circuit vehicle bay
- Utilities room phase 2
- Connection to ventilation system vehicle bay
- Connection to the control system of the doors
- various fault messages

1.1.8 Commissioning and as built documentation for the building automation system for
phase 2
- heating circuit
- hot water preparation
- Utilities room
- Telecom room
- Connection to air handling unit
- Connection to metering
- Connection to cooling units
- hygienic rinse
- various fault messages
1.1.9 BACnet/IP data points to be named IAW ASHRAE 135, VDI 3814-1, and Ramstein
Points Naming Convention
1.1.10 Prior to final Government acceptance, all as-built documents, warranty
documentation, EDE Files shall be handed over as hard copies and/or secure
electronic transfer (DOD SAFE).
1.2 ADDITIONAL TECHNICAL DESCRIPTION
1.2.2 All controllers to be BACnet/IP based, IAW ASHRAE 135 – 2020 and BTL certified.
1.2.3 Setpoints, trending, and alarms are to be determined by the Government.
1.2.4 To maintain system standardization and utilize available resources, all KMC buildings are
to be uniformly equipped with BTL-certified building automation systems, preferably of the
brand Kieback & Peter DDC4000, alternatively Siemens PXC4...PXC7. Only building
automation systems from these two manufacturers, including all associated components, are
permitted for use.
1.2.5 The contractor shall include project commissioning and submit a commissioning final
report. Critical aspect of the project include ensuring that systems and components are designed,
installed, tested, operated, and maintained according to the operational requirements.
• Quality assurance
• Cost-effectiveness
• Improved efficiency
• Enhaced safety
• Compliance with regulations

FAR 52.225-5, Trade Agreements“One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements.”

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 30, 2026

    Presolicitation

    Due April 14, 2026 at 10:30 AM EDT. SAM.gov, notice d8917f1d5e5e4d9db89c1ceba43f4cb7

    1 revisions on SAM
    • March 30, 2026: publish, presolicitation

Points of contact