Skip to content
  • 8,096 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought

7 AF Network Infrastructure Upgrade *Market Research*

F3J6AF26SS001

Department of the Air Force, F3j6af 7 Af. Electrical Contractors and Other Wiring Installation Contractors.

Response deadline

May 25, 2026 at 11:00 PM EDT

Closed 166 days ago. Posted May 20, 2026. Scheduled to archive June 10, 2026.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one closed in 2026

44 like it are open now in electrical contractors and other wiring installation contractors

All 44 open in electrical contractors and other wiring installation contractors

Description

As published on SAM.gov.

*Disclaimer* To receive this requirement contractor must have an active Secret/NOFORN clearance.

 This requirement is for upgrading the network infrastructure serving Building 933 at Osan Air Base. The intent is to provide a complete, tested, labeled, and documented fiber and copper horizontal distribution system. The fiber solution begins at new fiber optic distribution panels (FODPs) with LC termination points and extends to end-user outlet locations with LC keystone-style connections installed in faceplates. The copper solution begins at new copper patch panels in the designated IT rooms and extends to end-user outlet locations with Category 6 (CAT6) RJ45 keystone connections installed in faceplates. 

The Contractor shall furnish all labor, materials, supervision, tools, test equipment, pathway components, cabling, terminations, patch panels, keystones, faceplates, labeling, documentation, and incidentals required to install the new fiber optic and copper CAT6 infrastructure. The completed work shall support Government acceptance testing and turnover to USAF Communications Squadron staff and 7 AF/A6. All work shall be performed in accordance with applicable DoD, USAF, and host nation policies within this SOW, ensuring compliance with security, safety, and communications infrastructure standards. 

To request the SOW and the drawings, please e-mail your request to the points of contact, with the neccessary documentation that shows clearance requirements.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 20, 2026

    Sources sought

    Due May 25, 2026 at 11:00 PM EDT. SAM.gov, notice 7d3301d06ad14e1bba8317006781b6ff

    1 revisions on SAM
    • May 20, 2026: publish, sources sought

Points of contact