Skip to content
Abierto

Combined synopsis and solicitation, total small business set-aside, first published as solicitation

Commercial Truck Requirement

F2D0AA4200A001

Department of the Air Force, FA8201 AFSC Ol H Pzio. Automobile and Light Duty Motor Vehicle Manufacturing.

Response deadline

September 4, 2024 at 4:00 PM EDT

Closed 743 days ago. Posted August 27, 2024, first published August 14, 2024. Scheduled to archive September 19, 2024.

Description

As published on SAM.gov.

Required Delivery is 60 days ARO. The following requirements are essential for the 55R vehicles to effectively operate in diverse range conditions (Chevy Silverado ZR2 or F-150 Ford Raptor are the accepted equivalent models for these requirements):

Vehicle Type: front engine, rear/4-wheel-drive, 5-passenger, 4-door pickup VEHICLE LAYOUT: Front-engine, 4WD, 5-pass, 4-door truck ENGINE: 3.0L turbo direct-injected diesel DOHC 24-valve I-6 POWER (SAE NET): 305 hp @ 3,750 rpm TORQUE (SAE NET): 495 lb-ft @ 1,500 rpm TRANSMISSION: 10-speed automatic CURB WEIGHT (F/R DIST): 5,770 lb (57/43%)

WHEELBASE: 147.4 in LENGTH x WIDTH x HEIGHT: 231.9 x 81.2 x 75.4 in 0-60 MPH: 7.1 sec QUARTER MILE: 15.5 sec @ 88.1 mph BRAKING, 60-0 MPH: 138 ft LATERAL ACCELERATION: 0.69 g (avg)

MT FIGURE EIGHT: 29.0 sec @ 0.56 g (avg)

EPA CITY/HWY/COMB FUEL ECON: 20/22/21 mpg EPA RANGE, COMB: 504 miles

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 14, 2024

    Solicitation

    Hill AFB 4X4 Full Size Crew Cab Pickup Truck

    Due August 21, 2024 at 8:00 PM EDT. SAM.gov, notice e80f30c37d02450aa92e0b39d695baa8

  2. August 27, 2024

    Combined synopsis and solicitation

    Due September 4, 2024 at 4:00 PM EDT. SAM.gov, notice 2397bce4f86443a9a6c8f9abe50858ba

Points of contact