Presolicitation, total small business set-aside
David Skaggs Research Center Fire Alarm Replacement, Boulder, CO
EQPXAFB-26-0008
Public Buildings Service, PBS Project Delivery West - Branch a. Electrical Contractors and Other Wiring Installation Contractors.
Response deadline
June 11, 2026 at 6:00 PM EDT
Closed 98 days ago. Posted May 11, 2026. Scheduled to archive June 26, 2026.
Description
As published on SAM.gov.
The existing Siemens fire alarm system does not meet current GSA facility standard or building code requirements. The existing fire alarm system was originally installed as a Siemens MXLV multiplex addressable fire alarm system in 1999. In 2008 a renovation of the fire alarm system added dual channel voice circuits and programming, and replaced all existing notification appliances with new synchronized strobe appliances, to include strobes and speaker strobes.
New synchronization modules were added to accomplish this. Currently the manufacturer no longer supports field initiating devices and notification appliances, and spare parts are becoming less frequently available resulting in higher maintenance and repair costs to the government.
A new fire alarm and emergency voice communication system will ensure operational integrity of the building fire alarm system, improve long-term maintenance capabilities, and avoid costly building disruptions if the existing fire alarm system experiences failures.
This project includes the design and installation of a new and complete network digital-addressable fire alarm system and emergency voice alarm communication system, a new bi-directional amplifier two-way radio communications enhancement system, and a new two-way communication system.
The system shall include all wiring, raceways, pull boxes, terminal cabinets, outlet and mounting boxes, control equipment, alarm and supervisory signal initiating devices, alarm notification appliances, and all other accessories and miscellaneous items required for complete operational systems even though each item is not specifically mentioned or described.
The fire alarm installation shall also include the installation of new digital addressable elevator smoke detection control panels which are monitored by the base building fire alarm system via alarm, supervisory, and trouble signal contacts. A new elevator smoke detection control panel shall be provided for each elevator machine room. Fire alarm replacement may be phased, however DB phasing plans must be reviewed and acceptable to GSA authority having jurisdiction. Upon acceptance of the new fire alarm system the contractor shall be responsible for demolition of the
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 11, 2026
Presolicitation
Due June 11, 2026 at 6:00 PM EDT. SAM.gov, notice 46dbdb2031bc4f71826ba2ea42a56199
Points of contact
- Corey Roundfieldcorey.roundfield@gsa.gov7206560243
Also open from this buyer
- Wichita Restroom renovationsSolicitationSmall businessNAICS 236220Kansas47PD5126R0016Closes in 5 daysSep 22