Sources sought, total small business set-aside
Repair B440 Blaze Hangar, T7 Electrical Upgrades
EEPZ243754
Department of the Air Force, FA3022 14 Cons Lgca. Electrical Contractors and Other Wiring Installation Contractors.
Response deadline
June 24, 2024 at 8:30 AM EDT
Closed 861 days ago. Posted June 6, 2024. Scheduled to archive July 9, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
38 like it are open now in electrical contractors and other wiring installation contractors
- Edwards AFB Holiday Light & Decor Installation
Department of the Air Force, FA9301 Aftc Pzio
Closes todayNov 2 - Generator Inspection Service and Routine Maintenance -
Department of Veterans Affairs, 246-Network Contracting Office 6
SolicitationSDVOSBNAICS 238210Virginia36C24627Q0090Closes todayNov 2 - 692-21-101 CON NRM Improve Site Lighting and Lighting Controls for Energy Efficiency
Department of Veterans Affairs, 260-Network Contract Office 20
PresolicitationSDVOSBNAICS 238210White City, OR36C26027R0026Closes tomorrowNov 3
All 38 open in electrical contractors and other wiring installation contractors
Description
As published on SAM.gov.
See Statement of Work for further description. SUMMARY The Contractor must provide all plant, labor, equipment, transportation, and tools required to retrofit building 440, The Blaze Hangar, in preparation for the T-7. The work shall include but is not limited to:
the retrofit of the 480V electrical distribution system, the 400 Hz electrical distribution system, the restriping of the floor to align with the size and parking spaces for the T-7. Perform all work according to this Statement of Work (SOW), all related AF requirements, and other codes and references. BACKGROUND With the roll out of a new airframe the existing facilities will need to be retrofitted to accommodate it. The size of the T-7 is different from the T-38 and the floor stripping will need to be adjusted to account for this. The electrical foot print of the T-7 is higher than the T-38 and the existing power stations and 400 Hz system in the hangar will need to be upgraded.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 6, 2024
Sources sought
Due June 24, 2024 at 8:30 AM EDT. SAM.gov, notice 9b56f5db6cef436aa8bec1adffad839b
Points of contact
- Brooke Socolofskybrooke.socolofsky@us.af.mil662-434-7226
- Willie Commonwillie.common.1@us.af.mil6624347780