Skip to content
  • 6,927 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought, total small business set-aside

Repair B440 Blaze Hangar, T7 Electrical Upgrades

EEPZ243754

Department of the Air Force, FA3022 14 Cons Lgca. Electrical Contractors and Other Wiring Installation Contractors.

Response deadline

June 24, 2024 at 8:30 AM EDT

Closed 861 days ago. Posted June 6, 2024. Scheduled to archive July 9, 2024.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one closed in 2024

38 like it are open now in electrical contractors and other wiring installation contractors

All 38 open in electrical contractors and other wiring installation contractors

Description

As published on SAM.gov.

See Statement of Work for further description. SUMMARY The Contractor must provide all plant, labor, equipment, transportation, and tools required to retrofit building 440, The Blaze Hangar, in preparation for the T-7. The work shall include but is not limited to:

the retrofit of the 480V electrical distribution system, the 400 Hz electrical distribution system, the restriping of the floor to align with the size and parking spaces for the T-7. Perform all work according to this Statement of Work (SOW), all related AF requirements, and other codes and references. BACKGROUND With the roll out of a new airframe the existing facilities will need to be retrofitted to accommodate it. The size of the T-7 is different from the T-38 and the floor stripping will need to be adjusted to account for this. The electrical foot print of the T-7 is higher than the T-38 and the existing power stations and 400 Hz system in the hangar will need to be upgraded.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 6, 2024

    Sources sought

    Due June 24, 2024 at 8:30 AM EDT. SAM.gov, notice 9b56f5db6cef436aa8bec1adffad839b

Points of contact