Skip to content
Abierto

Solicitation, total small business set-aside

BIL Funded - Eugene Airport (EUG) ATCT Elevator Modernization

1EUG

Federal Aviation Administration, 697DCK Regional Acquisitions SVCS. Other Building Equipment Contractors.

Response deadline

February 29, 2024 at 1:00 PM EST

Closed 932 days ago. Posted January 23, 2024. Scheduled to archive March 15, 2024.

Description

As published on SAM.gov.

The elevator that serves the Airport Traffic Control Tower (ATCT) at the Eugene (EUG) Airport (Eugene, OR) was installed in 1986. The elevator is an electric basement geared traction elevator has a 2500-pound car weight rating with a speed 150 Feet Per Minute (FPM) that serves 5 floors and stops. The elevator is the primary means of vertical transportation for the building and is the only elevator that serves the ATCT. This elevator is in operational condition. This project will replace aging components including but not limited to INSERT FROM REPORT. The project will also bring the elevator up to the most recent version of the ASME A17.1 elevator code.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 23, 2024

    Solicitation

    Due February 29, 2024 at 1:00 PM EST. SAM.gov, notice ee11baf799e248a48c410ff4468d0c23

Points of contact