- INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT FOR INLAND AND COASTAL VESSELS ENGINEERING SERVICES, NAVAL ARCHITECTURE, AND MARINE ENGINEERING
Department of the Army, W2SD Endist Philadelphia
Combined synopsis and solicitationSmall businessNAICS 541330Location not publishedW912BU26RA036Closes tomorrowNov 6 - PMCP-SS_RFP
US Special Operations Command, HQ Ussocom
SolicitationSmall businessNAICS 541330Location not publishedH9240226RE005Closes tomorrowNov 6 - Seaport - CTF Design Services Follow On
Department of the Navy, NSWC Philadelphia Div
SolicitationSmall businessNAICS 541330Location not publishedN6449826R0020Closes tomorrowNov 6
Description
As published on SAM.gov.
Following the May 2026 RFI feedback and one-on-one meetings with industry, the USGS has matured its acquisition strategy for the Landsat 10 Mission Operations Center and Flight Operations scope of work. USGS intends to procure a new commercial, cloud-based or containerized cloud-native MOC to be hosted using USGS's Cloud Hosting Services (CHS) III services or EROS mission infrastructure Container (Kubernetes) Hosting Solution, respectively.
Based on industry feedback and technical study results, the Government is no longer considering the option to augment the existing Landsat 8 and 9 LMOC. Included in this announcement are the following reference materials: 1) Draft MOC/Ops Synopsis Document 2) Draft MOC Requirements Document The Government is not requesting feedback at this time; industry will have an opportunity to provide feedback when the Draft RFP is released.
These draft documents build on feedback received in response to the May 2026 RFI and provide industry with additional technical detail to clarify the Government's current approach to the Landsat 10 MOC Development and Operations scope of work. These documents will continue to be refined following the spacecraft award and feedback on the draft RFP leading up to the final RFP release.
The MOC functions document previously shared with the RFI has been incorporated into the MOC Synopsis and will no longer be issued as a standalone RFP document.
USGS is working toward the following timeline for the RFP surrounding this scope of work: * Draft RFP Release: Estimating early February 2027 (anticipate this will be following spacecraft RFP award) * Industry briefing (virtual): Shortly after Draft RFP announcement * Feedback response period: Anticipated to be 30 days * Tentative one-on-one meetings with contractors as needed to clarify any feedback provided (could be virtual or in-person, at the government's discretion) * Final RFP Release: As soon as possible following updates to documentation based on industry feedback. Estimating May 2027
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
November 4, 2026
Special notice
SAM.gov, notice b1979195245a4007bbbf1a08b58155bf
Points of contact
- Rampersad, Triciatricia_rampersad@ios.doi.gov7036487382