Special notice
Air National Guard (ANG) Fiscal Year 2027 Planned Design and Construction Projects
Department of the Army, National Guard Bureau.
Status
Special notice
Posted September 24, 2026. Scheduled to archive September 30, 2027.
Description
As published on SAM.gov.
This is an informational posting for Architect-Engineer (A-E) and Construction vendors interested in doing work with the Air National Guard (ANG).
Attached is the Integrated Priority List (IPL) for construction projects and design requirements planned for award in Fiscal Year (FY) 2027. The list incorporates all National Guard Bureau (NGB) Military Construction (MILCON) and Facilities Sustainment, Restoration, and Modernization (FSRM) funded projects. This list does not include Installation/Base level funded projects. Procurement methods for each project is determined individually at the Installation/Base level.
NGB is NOT requesting any information from interested vendors; this posting is for information only.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- NGB Design Requirements List 20260924.pdf66 KB, September 24, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 24, 2026
Special notice
SAM.gov, notice c6b09d32b6224500a20bebae42bf4190
1 revisions on SAM
- September 24, 2026: publish, special notice
Points of contact
- Amanda Bogue, Contracting Officeramanda.m.bogue.civ@army.mil
- Michael Dixon, Contracting Officermichael.d.dixon82.civ@army.mil