Combined synopsis and solicitation
Energy Storage Systems for PRFTA
BZ-2024-06
Department of Energy, Berkeley Natl Lab - DOE Contractor. Battery Manufacturing.
Response deadline
May 29, 2024 at 6:00 PM EDT
Closed 888 days ago. Posted May 21, 2024, first published May 2, 2024. Scheduled to archive June 13, 2024.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2024
15 like it are open now in battery manufacturing
- UPS Battery Replacement
Department of Veterans Affairs, 262-Network Contract Office 22
Combined synopsis and solicitationSmall businessNAICS 335910Anywhere in the US36C26227Q0064Closes in 10 daysNov 13 - BATTERY
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 335910Anywhere in the USN0010427QBA54Closes in 2 daysNov 5 - SMT BATTERY
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 335910Anywhere in the USN0010427QBA45Closes in 2 daysNov 5
Description
As published on SAM.gov.
The Lawrence Berkeley National Laboratory requests a proposal for fabrication and delivery of two Energy Storage Systems. LBNL is leading a project to develop and demonstrate a modular microgrid. The microgrid design includes two layers of resiliency: an islanded operation of the entire base in case of an outage and the ability to island one or more groups of critical loads in the event of an internal fault.
The nesting capability will enable islanded operation of critical loads supported by the site’s own photovoltaic system and battery, electrically disconnected from the larger microgrid. The Parks Reserve Forces Training Area in Dublin, California serves as a training area for an estimated 250 reserve units and 20,000 reservists in northern California, including the Army Reserve, Army National Guard, active Army, and active and reserve units of the Air Force, Navy, and Marine Corps.
Other Federal, state, and local entities also use this installation. This solicitation is for two Energy Storage Systems that will have a capacity of approximately 0.5 to 1 megawatts and approximately 2 megawatt-hours and will be connected to a 21 kilovolt distribution loop to provide energy storage capabilities and enhance grid stability at the Parks Reserve Forces Training Area. Installation is not included, only delivery and supervision during start-up/commissioning. Please see "RFP BZ-2024-06.pdf" in the attachments section below for more information and instructions.