Skip to content
  • 6,939 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Presolicitation, total small business set-aside

Cummins Generator Installations, Beale AFB

BAEY240021

Department of the Air Force, FA4686 9 Cons PK. Electrical Contractors and Other Wiring Installation Contractors.

Response deadline

June 27, 2024 at 4:00 PM EDT

Closed 858 days ago. Posted June 24, 2024, first published June 12, 2024. Scheduled to archive July 12, 2024.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one closed in 2024

38 like it are open now in electrical contractors and other wiring installation contractors

All 38 open in electrical contractors and other wiring installation contractors

Description

As published on SAM.gov.

The 9th Contracting Squadron has a requirement for the replacement of two separate standby diesel generator systems, located at buildings B810, and B845. Existing generators shall be replaced, and new Cummins 20kW generator with adequately sized tank shall be installed, to include a new compatible Bypass Automatic Transfer Switch (BTPC).

Contractor shall furnish all supervision, labor, tools, equipment, materials, operations, and incidentals as required and will perform all necessary connections to the generator and ATS so that they are fully operational IAW all current NFPAs, DAFMANs, UFCs, State and local codes and regulations. The contractor is also responsible for applying for the Air Quality permits from Feather River Air Quality in coordination with 9 CES Environmental Section for compliance.

Additionally, the contractor will coordinate with 9 CES/Environmental Section to initiate an Authority to Construct, and AF103. The contractor will relocate the existing generator and associated equipment to the 9th Civil Engineer Squadron Compound upon coordination with the Base Project Manager. All installation(s) shall be completed in accordance with the manufacturer’s instructions for installing the equipment, with a start-up and turn-over of O&M manuals after installation.

This notice will serve to satisfy synopsis requirement as outlined in FAR 5.204 If there are any reccomendations for more accurate NAICS or PSC codes please notify the CA/CO so that those concerns may be addressed in either future sources sought or the formal solictation. If there are any concerns about the Statement of Need or the accompanying supporting documentation, please notify the CA/CO so that those concerns may be addressed, and/or incorportated into those documents. Please include your companies CAGE code and UEI in initial correspondence.

Revision 1: Replaced SOW with SON (Dated 17 Jun 24).

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 12, 2024

    Presolicitation

    Due June 27, 2024 at 4:00 PM EDT. SAM.gov, notice 14e8f1c2b6144e64b71e5a9ea0ed8ebc

  2. June 24, 2024

    Presolicitation

    Due June 27, 2024 at 4:00 PM EDT. SAM.gov, notice e9e0edc935444f94b21e9f42b8e68835

Points of contact