Sources sought
B695 Tank Farm Revitalization-Design-Build
B673616
Department of Energy, LLNS – DOE Contractor. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
June 15, 2026 at 8:00 PM EDT
Closed 138 days ago. Posted June 1, 2026. Scheduled to archive June 22, 2026.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2026
44 like it are open now in plumbing, heating, and air-conditioning contractors
- Cooling Tower Refurbishment - Three (3) Cells
Indian Health Service, Phoenix Area Indian Health SVC
Sources soughtIndian small businessNAICS 238220Winterhaven, CAACQ-IHS-2027-U-00021Closes tomorrowNov 2 - 2nd Floor HVAC Duct Repairs VA Central California Healthcare System
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 238220Fresno, CA36C26127Q0127Closes in 3 daysNov 4 - Replace HVAC Rooftop Units at Building 2275
Department of the Army, W7MX Uspfo Activity Caang 163
PresolicitationNAICS 238220California27-P-0000-042463Closes in 4 daysNov 5
All 44 open in plumbing, heating, and air-conditioning contractors
Description
As published on SAM.gov.
Lawrence Livermore National Security, LLC (hereinafter called “LLNS”) is seeking sources for the performance of the design build of the B695 Tank Farm Revitalization.
Tank Farm Improvement Project Summary
This project scope includes the design, demolition, and installation of five chemical reagent dosing systems for nine 5,000-gallon waste treatment tanks; the removal and replacement of the nine tank mixer assemblies (one for each of nine waste treatment tanks); design and installation of nine coarse bubble diffusers, one for each of nine waste treatment tanks); and an optional instrumentation removal and instillation.
The nine waste treatment tanks are part of Lawrence Livermore National Laboratory’s (LLNL) waste treatment facility operated by the Radioactive and Hazardous Waste Management (RHWM) program. This renovation aims to upgrade the wastewater treatment system to improve operational efficiency, enhance safety, and ensure continued compliance with regulatory requirements.
The following provides a description of the planned systems.
Base Scope
- Reagent Dosing System
The new reagent dosing system will be a centralized system to dose 5 different reagents from 55-gallon drums into nine 5,000-gallon treatment tanks. The system will operate through the existing PLC system and dose specified amounts.
- Tank Mixers
The tank mixer assemblies shall include blades, shaft, gearbox, and motor. The mixer shall be capable of thoroughly mixing the 5,000-gallon tank in 10 mins.
- Course Bubble Diffusers
The course bubble diffusers will be installed inside each of the nine 5,000-gal treatment tanks and be capable of aerating the liquid with 60 scfm per tank.
Optional Scope
- Instrumentation
The new instrumentation shall be pH/ORP, conductivity, oxygen, TSS, and liquid level sensor on each tank to aid in treatment and handling of the stored waste.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 1, 2026
Sources sought
Due June 15, 2026 at 8:00 PM EDT. SAM.gov, notice 9a2f817ed62341b3a60c5c704c7c6441
1 revisions on SAM
- June 1, 2026: publish, sources sought
Points of contact
- Gary Arrudaarruda2@llnl.gov