Sources sought, total small business set-aside
B369 Boiler
B369_Boiler
Department of the Air Force, FA4600 55 Cons PKP. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
May 11, 2026 at 12:00 PM EDT
Closed 174 days ago. Posted April 30, 2026, first published April 30, 2026. Scheduled to archive May 26, 2026.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2026
44 like it are open now in plumbing, heating, and air-conditioning contractors
- Glycol Loop Flushing - NWI
Department of Veterans Affairs, Network Contract Office 23
Combined synopsis and solicitationSDVOSBNAICS 238220Omaha, NE36C26327Q0060Closes in 9 daysNov 10 - R-410A LEAK DETECTORS (Bldgs 750, 751 & 768)
Department of the Air Force, FA4460 19 Cons Pka
SolicitationSmall businessNAICS 238220Anywhere in the USFA446027Q0006Closes tomorrowNov 2 - Green Mountain National Forest Storage tank cleaning and inspection at Hapgood Pond
Forest Service, Green Mountain National Forest
Closes tomorrowNov 2
All 44 open in plumbing, heating, and air-conditioning contractors
Description
As published on SAM.gov.
The scope of work is to provide a new NTI model LX-600 boiler; 600,000 BTU input, with ASME SS heat exchanger, floor-mount, factory-provided ASME relief valve, at least 4 to 1 turn down, 95% combustion efficiency, 4” exhaust vent and 4” fresh air intake, with outdoor sensor, CSD-1 controls, integrated electronic controller with touch screen access, and factory-installed condensate trap and included condensate drain kit.
The hydronic gas boiler must be at least 600 MBH capacity, with at least 4:1 turndown on natural gas, and dimensions no larger than 24"wide x 47.5"deep(long) x 55" high, with water (2") and gas (1") connections along the left-hand length side and air inlet/exhaust (4") connections along the top or left-hand length side.
The Contractor shall provide at least a 1-year comprehensive warranty on all new materials.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- SoN B369 boiler purchase.pdf80 KB, April 30, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 30, 2026
Sources sought
Due May 11, 2026 at 12:00 PM EDT. SAM.gov, notice 0e1891f30e3e4857a8ee2e49174239ec
3 revisions on SAM
- June 3, 2026: publish, solicitation
- April 30, 2026: publish, sources sought
- April 30, 2026: publish, sources sought
April 30, 2026
Sources sought
Due May 11, 2026 at 12:00 PM EDT. SAM.gov, notice 2da9c87187db4ce484f5f6cbadf06f37
2 revisions on SAM
- April 30, 2026: publish, sources sought
- April 30, 2026: publish, sources sought
Points of contact
- TSgt Jennifer Prestridgejennifer.prestridge.1@us.af.mil4022946393
- Casey Huptoncasey.hupton.1@us.af.mil4022321475