Description

As published on SAM.gov.

The objective of the Audit is to inform US Capitol Power Plant (CPP) management regarding the current conditions and operational practices within the utility tunnels in terms of safety and health compliance to local, state, and federal regulations. The Audit shall identify and document all current areas of non-compliance. Findings shall address condition changes as related to past reports, new deterioration or safety concerns, and the probable cause.

The report shall also identify if there is a potential for tunnel or pipe failure or other imminent concerns. The report shall also address noted changes in the condition of the tunnel as it relates to past reports or audits, including but not limited to the acceleration of concrete spalling de-laminations, cracks, damages to pipe insulation, and conditions of electrical conduits. The Audit Report shall contain digital photograph(s).

Health and Safety Audits shall be completed under the direction of a Certified Industrial Hygienist and/or Safety Specialist, and Mechanical and Electrical Engineer(s). In addition to the Primary NAICS Code 541330, the AOC is also accepting the following:

541620 – Environmental Consulting Services (industrial hygiene, asbestos/lead/mold assessment) 541380 – Testing Laboratories and Services (air quality, noise/PEL testing) 541350 – Building Inspection Services (egress, ladders, hatches, code compliance)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 4, 2026

    Solicitation

    Due August 13, 2026 at 5:00 PM EDT. SAM.gov, notice 8d7e8e41518b470ab8e858f066b5b4cc

Points of contact