Skip to content
Abierto

Combined synopsis and solicitation

New Turbo Molecular High Vacuum Pump for Vacuum Facility 6

80NSSC26942555Q

National Aeronautics and Space Administration, NASA Shared Services Center. Air and Gas Compressor Manufacturing.

Response deadline

September 9, 2026 at 1:00 PM EDT

Closed 7 days ago. Posted September 8, 2026, first published August 31, 2026. Scheduled to archive September 24, 2026.

Description

As published on SAM.gov.

Q&A

1. What is the required quantity?

One

2. Please confirm the exact delivery address and required delivery date or lead-time requirement. The RFQ states FOB Destination but does not identify the destination address or schedule.

21000 Brookpark Rd

Building 301 Dock

Cleveland, OH  44135

3. Is the requirement limited to supply and delivery, or are installation, integration, testing, commissioning, removal, training, or on-site technical support required?

Supply & delivery only

4. Please confirm whether either listed brand-name model is acceptable when configured exactly to the stated specifications: Ebara EMT2400-MBWB or Osaka TG2400-MBWB.

Yes

5. Please provide any required technical data sheets, country-of-origin information, warranty terms, packing/shipping instructions, and acceptance criteria not included in the RFQ.

Standard factory warranty terms shall be honored.  Packing shall be of sufficient quality to protect from damage during transit.

6. Please confirm whether any bonding, insurance, licensing, cybersecurity, facility-access, export-control, or site-visit requirements apply to this purchase.

No

7. Please confirm whether manufacturer pricing proof and reseller authorization may be provided as manufacturer/distributor letters attached to the quotation.

I am not familiar with this question.

8. Please confirm whether the Government has identified a specific controller, connector, cable, inlet screen, air-cooling kit, or water-cooling configuration beyond the specifications in Section 1.

Turbopump with air and water cooling kit, inlet screen and cable only.  No controller is needed. If needed, the controller can be removed from the SOW.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 31, 2026

    Combined synopsis and solicitation

    Due September 7, 2026 at 1:00 PM EDT. SAM.gov, notice ffc8fb98943c49b3bf66ed75f751c388

  2. September 9, 2026

    Combined synopsis and solicitation

    Due September 9, 2026 at 1:00 PM EDT. SAM.gov, notice ad2336b3e47b42289aeeee7fb5820e0c

    2 revisions on SAM
    • September 9, 2026: publish, combined synopsis and solicitation
    • September 1, 2026: publish, combined synopsis and solicitation

Points of contact