Presolicitation
Addendum for New/Remodel of B250 Control Room Preliminary Engineering Report (PER)
80JSC024PER
National Aeronautics and Space Administration, NASA Johnson Space Center. Architectural Services.
Response deadline
June 7, 2024 at 6:00 PM EDT
Closed 877 days ago. Posted July 17, 2024, first published June 4, 2024. Scheduled to archive August 17, 2024.
Get the next one like this from National Aeronautics and Space Administration by email, the day it is posted.Find my opportunities
This one closed in 2024
7 like it are open now in architectural services
- Architect & Engineering Services, Indefinite-Delivery, Indefinite-Quantity (IDIQ) Multiple Award (A&E) Contracts needed for new construction, renovation, alteration and repairs required by Federal Prison Industries (FPI)
Federal Prison Industries, INC, Federal Prison Industries, INC
Solicitation8(a)NAICS 541310Washington, DCDJU1630000393Closes tomorrowNov 2 - IDIQ For Architect Engineer (A/E) Services for Central Office
Federal Prison System / Bureau of Prisons, Fao
PresolicitationSmall businessNAICS 541310Washington, DC15BBNF26R70000006Closes in 3 daysNov 4 - 657-27-209JB Renovate Main Lobby, Bldgs 1 & 53
Department of Veterans Affairs, 255-Network Contract Office 15
PresolicitationSDVOSBNAICS 541310Missouri36C25527R0007Closes in 9 daysNov 10
Description
As published on SAM.gov.
NASA/White Sands Test Facility (WSTF) has a requirement for the revision of the New/Remodel of B250 Control Room Preliminary Engineering Report (PER), which was previously completed in 2019. NASA/WSTF intends to issue a sole source contract to acquire the services from Write & Dalbin Architects, Inc. (WDA). WDA is the only responsible source to complete this effort as this Contractor completed the original PER for the New/Remodel of B250 Control Room.
The statutory authority permitting other than full and open competition is 10 U.S.C. 3204(a)(1), as implemented by FAR 6.302-1(a)(2)(iii)(A), only one responsible source and no other supplies or services will satisfy agency requirements without substantial duplication of cost to the Government.
The Contractor has exclusive knowledge of the base data related to many elements of the Facilities Requirements Document including site work, civil engineering, electrical requirements, mechanical requirements, energy management requirements, controls and instrumentation, ancillary test area monitoring, physical security, and information technology.
If the Government selected another source, the Government would have to incur additional costs to recreate aspects of this work that has already been obtainied from WDA. This duplication of cost is not in the best interest of the Government.
The Government intends to acquire a commercial services using FAR Part 12. Interested organizations may submit their capabilities and qualifications to perform the effort electronically via email to Cynthia Uribe at cynthia.uribe@nasa.gov and Fabian Cueto at jesus.f.cueto@nasa.gov not later than 4:00 p.m. Mountain Daylight Time on June 7, 2024. Such capabilities/qualifications will be evaluated solely for the purpose of determining whether or not to conduct this acquisition on a competitive basis.
A determination by the Government not to compete this acquisition on a full and open competition basis, based upon responses to this notice, is solely within the discretion of the Government. NASA Clause 1852.215-84, Ombudsman, is applicable. The Center Ombudsman for this acquisition can be found at : https://www.hq.nasa.gov/office/procurement/regs/Procurement-Ombuds-Comp-Advocate-Listing.pdf
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Cynthia M. Uribecynthia.uribe@nasa.gov
- Jesus Cueto (Fabian)jesus.f.cueto@nasa.gov