Combined synopsis and solicitation, total small business set-aside
CGC Polar Star Water Pump Spare Parts
70Z08525Q9653_1
US Coast Guard, SFLC Procurement Branch 2. Measuring, Dispensing, and Other Pumping Equipment Manufacturing.
Response deadline
September 25, 2025 at 5:00 PM EDT
Closed 408 days ago. Posted September 22, 2025. Scheduled to archive October 10, 2025.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2025
48 like it are open now in measuring, dispensing, and other pumping equipment manufacturing
- SERFILCO PUMPS FOR PLATING SHOP
Department of the Air Force, FA8132 AFSC Pzimc
Combined synopsis and solicitationSmall businessNAICS 333914Anywhere in the USFA813227Q0004Closes in 2 daysNov 9 - PUMP,CENTRIFUGAL
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationHUBZoneNAICS 333914Anywhere in the USSPE7M127T1691Closes in 3 daysNov 9 - NOZZLE,FUEL AND OIL SE
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationSmall businessNAICS 333914Anywhere in the USSPE8EE27T0348Closes in 3 daysNov 9
All 48 open in measuring, dispensing, and other pumping equipment manufacturing
Description
As published on SAM.gov.
The United States Coast Guard Surface Forces Logistics Center (SFLC) is issuing this combined synopsis and solicitation for the procurement of parts listed below to support the CGC Polar Star. This requirement will result in a firm fixed-price contract.
Scope of Work:
The contractor shall supply the parts listed in the attached Statement of Work (SOW)
All parts must meet the specifications outlined in the attached SOW and/or other applicable documents.
Contract Type:
This requirement will result in a firm fixed-price contract.
Set-Aside Status:
This procurement is a small business set-aside.
Place of Performance/Delivery Location:
The parts shall be delivered to:
ATTN: Brad Jopling
USCGC Polar Star Port Engineers
1519 Alaskan Way S
Bldg 1
Seattle, WA 98134
Delivery must be completed no later than 01 February 2026 to ensure installation during CGC Polar Star’s next availability.
Submission Deadline:
Offerors are advised to carefully review all solicitation documents and adhere to the submission instructions provided. Proposals must be submitted no later than 25 September 2025 at 1400 Pacific Time.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 70Z08525Q9653_1_SOW.pdf300 KB, September 22, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 22, 2025
Combined synopsis and solicitation
Due September 25, 2025 at 5:00 PM EDT. SAM.gov, notice 8fa11fe2f8a0464db340174fe58b5d71
2 revisions on SAM
- September 25, 2025: publish, combined synopsis and solicitation
- September 22, 2025: publish, combined synopsis and solicitation
Points of contact
- JASON GARRISJASON.A.GARRIS@USCG.MIL5716081592
- McTague, SeanSean.P.McTague@uscg.mil15716143888