Special notice, 8(a) sole source
CGC MOBILE BAY HYDRAULIC SWING DRIVE ASSEMBLIES
70Z08525Q0020194
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
July 9, 2025 at 11:00 AM EDT
Closed 486 days ago. Posted June 25, 2025. Scheduled to archive July 24, 2025.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2025
103 like it are open now in ship building and repairing
- USNS SALVOR (T-ARS 52) VOYAGE REPAIR AVAILABILITY (VRA)
Department of the Navy, NAVSUP FLT Log CTR Yokosuka
SolicitationNAICS 336611Outside the USN6264927QL003Closes in 2 daysNov 9 - U.S. NAVY VESSEL - CASREPS - AC AND REEFER PLANT REPAIR
Department of the Navy, NAVSUP FLC Sigonella Naples Office
SolicitationNAICS 336611Outside the USN6817127QN009Closes in 2 daysNov 9 - Haul Out and Weld Repair
US Coast Guard, Cg-Sea-C23
Combined synopsis and solicitationPartial small businessNAICS 336611McKinleyville, CA52000PR270000277Closes in 2 daysNov 9
Description
As published on SAM.gov.
STATEMENT OF WORK CGC MOBILE BAY OPFAC:
09-17503 LOCATION:
Sturgeon Bay, WI EQUIPMENT:
APPLETON CRANE EB150-75-55S COMPONENT AFFECTED:
HYDRAULIC SWING DRIVE ASSEMBLIES PARTS:
AMD-3343 SWING DRIVE ASSEMBLY Qnty:
04 Drawing: APPLETON MARINE_CRANE ASSEMBLY_AMD 852 All work shall be conducted at cutters homeport in Sturgeon Bay, WI. Contractor must witness the operation of the crane. Once pre-operational test is complete, contractor must remove all 04 swing drive assemblies. Once swing drive assemblies are removed, they must properly and safely package all 4 swing drive assemblies for transport. Unit will assume control of the original swing drive assemblies.
Contractor must then clean and prep the mounting surface for installation of replacement swing drive assemblies. Contractor shall then provide 04 replacement swing drive assemblies and install them. Once installation is complete, contractor must witness there are no leaks; ensure proper operation of the crane; and witness both static and dynamic weight test of the crane. Unit personnel will be at the ready to operate the crane.
Contractor will provide any shore side equipment needed for use to remove any parts of the crane. Contractor must provide all parts, consumables, and hydraulic fluid. Unit personnel, if available, will be able to assist. Contractor must understand that they are lead on this project and unit personnel are ONLY to assist.
Unit POC: Mobile Bay POC CWO Josh Deisher (920)
743-7351 Address: USCGC Mobile Bay WTGB103 36 S Neenah Ave Sturgeon Bay WI 54235
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 25, 2025
Special notice
Due July 9, 2025 at 11:00 AM EDT. SAM.gov, notice ea8cba0d57124e76b83bb6668ed22356
Points of contact
- DONNA O'NEALDonna.J.O'Neal@uscg.mil5103931145
- ULISES BALMACEDAUlises.O.Balmaceda@uscg.mil5104375438