Skip to content
Abierto

Solicitation

RECAPITALIZE RUNWAY 1-19 at U.S. COAST GUARD BASE ELIZABETH CITY, NC.

70Z04725RPCNI0001

US Coast Guard, FDCC. Commercial and Institutional Building Construction.

Response deadline

March 14, 2025 at 4:30 PM EDT

Closed 553 days ago. Posted March 12, 2025, first published November 4, 2024. Scheduled to archive December 31, 2025.

Description

As published on SAM.gov.

Amendment 0010 for Solicitation 70Z04725RPCNI0001 - Submission Instructions Reminder THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III), POOL 1. Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation, and other services for the design/build to Restore Runway 1-19 (RPUID 24082) to operational conditions as a crosswind, alternate runway for the design mix aircraft at its present dimension of 4,518-feet in length and 150-feet in width; also, to include Taxiway Kilo and Taxiway Golf.

The contractor shall also provide and install operational LED edge lighting, guidance signs, lighting system components supporting taxiways for Runway 1-19 and various taxiways. All lighting shall comply with FAA standards (FAA AC 150/5340-30).

Option Item 0001:

RW 1-19 North Turnaround: Provide all services and materials necessary for the site demolition and disposal to construct a RW 1-19 North Turnaround Pad. The RW 1-19 turn-around pad shall be compatible for the largest operating aircraft, the H-C 130 Construction shall be in accordance with the requirements of UFC 03-260-01 for Army and Air Force facilities based upon the HC-130 aircraft. Demolition shall include the removal of the existing PCC pavement section to natural subgrade.

New construction shall include the demolition of existing pavements and tie-into exiting airfield taxiways and runways. New work shall include all required airfield lights (i.e. edge lights), navigation aids, to include feeders and duct banks, and includes all pavement striping/markings.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 4, 2024

    Solicitation

    Due January 29, 2025 at 4:30 PM EST. SAM.gov, notice e32f333ca71446aab1c85501d1a456ae

  2. November 11, 2024

    Solicitation

    Due January 29, 2025 at 4:30 PM EST. SAM.gov, notice e87a0529f6ab44dcbecbc9d11fa0029a

  3. December 16, 2024

    Solicitation

    Due February 28, 2025 at 4:30 PM EST. SAM.gov, notice 94c6d7e98e5d4443adf3edc6ecd28b5d

  4. January 9, 2025

    Solicitation

    Due February 28, 2025 at 4:30 PM EST. SAM.gov, notice 9e17a05267b24edb994097bf98cb40a1

  5. January 10, 2025

    Solicitation

    Due February 28, 2025 at 4:30 PM EST. SAM.gov, notice ab18fc341c5441e9ac3f2f70695ce52c

  6. February 11, 2025

    Solicitation

    Due February 28, 2025 at 4:30 PM EST. SAM.gov, notice a769c24e98de4acab6716667e92630f8

  7. February 13, 2025

    Solicitation

    Due March 14, 2025 at 4:30 PM EDT. SAM.gov, notice a61db6a7874b4643934367004fd5a669

  8. February 24, 2025

    Solicitation

    Due March 14, 2025 at 4:30 PM EDT. SAM.gov, notice 13ca76d66d334469a237f471be9fad0e

  9. February 25, 2025

    Solicitation

    Due March 14, 2025 at 4:30 PM EDT. SAM.gov, notice 3cf94500deda4b64bf3be463a3a93bef

  10. February 25, 2025

    Solicitation

    Due March 14, 2025 at 4:30 PM EDT. SAM.gov, notice e716dd1c47f34be6a18d359ac6a99c9f

  11. February 26, 2025

    Solicitation

    Due March 14, 2025 at 4:30 PM EDT. SAM.gov, notice e08a0c9e927f41e68bc8c99f20e0dda4

  12. March 4, 2025

    Solicitation

    Due March 14, 2025 at 4:30 PM EDT. SAM.gov, notice af947da5dbc5439a8bd5e7fb7404b6a4

  13. March 12, 2025

    Solicitation

    Due March 14, 2025 at 4:30 PM EDT. SAM.gov, notice 892a912d519545d38162f9d7e09d2bfa

Points of contact