Combined synopsis and solicitation, total small business set-aside
Parking Lot Painting Renewal – USCG Base New Orleans
70Z02926QNEWO00350
US Coast Guard, Base New Orleans. Highway, Street, and Bridge Construction.
Response deadline
August 10, 2026 at 2:00 PM EDT
Closed 83 days ago. Posted July 27, 2026. Scheduled to archive August 10, 2026.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2026
36 like it are open now in highway, street, and bridge construction
- PRIMARY RUNWAY AND PAVEMENT REPAIRS LOCATED AT JOINT RESERVE BASE NEW ORLEANS, LOUISIANA.
Department of the Navy, Navfacsyscom Southeast
PresolicitationNAICS 237310New Orleans, LAN6945027R0007Closes in 3 daysNov 4 - FY27 NRM - Correct Mather Loop Road and Install Speed Bumps
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 237310Mather, CA36C26127Q0112Closes tomorrowNov 2 - BRCA 310427 Southbound Shuttle Stop
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237310Utah140P2026R0065Closes in 2 daysNov 3
Description
As published on SAM.gov.
The United States Coast Guard Base New Orleans, located at 1790 Saturn Blvd, New Orleans, LA 70129, requires a contractor to renew all painted surfaces in the parking lots in accordance with the attached Statement of Work. The contractor shall furnish all labor, tools, materials, transportation, equipment, supervision, and personnel necessary to complete the project. Work includes repainting approximately 260 standard parking spaces, 8 handicap accessible spaces with stenciled placarding, 37 stenciled “GV Parking” spaces, one red painted curb with “No Parking” stencil at the Fire Pump (approximately 120 linear feet), one white painted curb at the main entrance (approximately 40 linear feet), four curbs in front of fire hydrants painted red with “No Parking” stenciled, and renewal of two pedestrian crosswalks totaling approximately 50 linear feet. All work must comply with the Federal Highway Administration Manual on Uniform Traffic Control Devices (MUTCD) and Americans with Disabilities Act (ADA) standards for accessible spaces. The contractor is responsible for site safety and must implement a safety program in accordance with OSHA regulations, including appropriate barricades, signs, and signal lights. Any “Hot Work” operations such as welding, cutting, brazing, grinding, or any activity that could produce sparks or heat require a permit and at least 48 hours advance notification to the Contracting Officer’s Representative (COR).
Environmental compliance is required; all waste generated must be recycled or disposed of in accordance with the Resource Conservation and Recovery Act (RCRA) and all applicable federal, state, and local laws. Hazardous waste must be manifested off site with Base New Orleans listed as the generator and signatory. No waste or recycling may be disposed of in onsite dumpsters, and all chemicals must be preapproved by the contract POC with Safety Data Sheets (SDS) provided. Storm drains and waterways within range of potential discharge must be protected by covers or silt fence, and nothing may be discharged to a storm drain at any time during the project. The contractor must restore the site to a clean condition at the end of each workday and upon completion of the project, with final acceptance contingent on approval by the COR.
All work must be scheduled to minimize disruption to facility operations and performed between 8:00 AM and 4:00 PM, Monday through Friday, excluding federal holidays, unless otherwise approved by the Contracting Officer or their representative. The contractor will be permitted to use available electrical power and water, but not telephone services. Restroom facilities are available. Any damage to government property caused by the contractor must be repaired or replaced at no cost to the government. The contractor must comply with all base regulations, and personnel must remain within the designated work area unless otherwise required for performance of duties. Smoking is prohibited in Coast Guard buildings and must be restricted to designated areas.
A mandatory site visit is Mandatory prior to submitting a quote. Site visits must be scheduled with the Contracting Officer’s Representative (COR), CWO Mike Ackiss, at carlton.m.ackiss@uscg.mil. Any personnel without a TWIC, military, or prior approved ID must provide their first and last name at least five business days prior to arrival to allow for security badge creation and base access. The contractor must submit a detailed work schedule, report of findings, quote for further repair as needed, and Safety Data Sheets for all hazardous materials to the COR and obtain approval from Base New Orleans Environmental Protection prior to beginning work. All installation, workmanship, fabrication, assembly, inspection, and testing must comply with OSHA standards and all applicable federal, EPA, and State of Louisiana laws and regulations.
Award method will be lowest price technically acceptable. The evaluation factors are:
- Price
- Technical Acceptability
- Past Performance
The Government will evaluate the past performance of each offeror to determine the degree of confidence that the offeror will successfully perform the contract requirements. Evaluation will consider the relevance, quality, and timeliness of prior work as demonstrated through submitted references and independent government sources. Offerors with no relevant past performance will receive a neutral rating. Past performance will be rated and factored into the overall evaluation as specified in the solicitation.
Offerors, if they wish, can also provide information on problems encountered on the identified contracts and the offeror’s corrective actions. The Government shall consider this information, as well as information obtained from any other sources, when evaluating the offeror’s past performance. The source selection authority shall determine the relevance of similar past performance information.
All quotes must be submitted to: daniel.galarza@uscg.mil
IF A SITE VISIT IS MANDATORY, THE FOLLOWING CLAUSES APPLY:
- FAR 52.236-2 Differing Site Conditions. Apr 1984
- FAR 52.236-3 Site Investigation and Conditions Affecting the Work. Apr 1984
- FAR 52.236-27 Site Visit (Construction). Feb 1995
52.236-27 Site Visit (Construction) (Feb 1995):
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: CWO Mike Ackiss
Address: USCG Base New Orleans, 1790 Saturn Blvd, New Orleans, LA 70129
Email: carlton.m.ackiss@uscg.mil
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Base New Olreans overhead view.png1.2 MB, July 27, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 27, 2026
Combined synopsis and solicitation
Due August 10, 2026 at 2:00 PM EDT. SAM.gov, notice 764cb12838c2412da97b954b002da7b3
1 revisions on SAM
- July 27, 2026: publish, combined synopsis and solicitation
Points of contact
- carlton ackissCarlton.M.Ackiss@uscg.mil5042394937
- GALARZA, DANIELDANIEL.GALARZA@USCG.MIL2068274020