Skip to content
  • 8,089 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

Electric Submersible Pumps

70Z02925Q0000069

US Coast Guard, Base New Orleans. Industrial Machinery and Equipment Merchant Wholesalers.

Response deadline

February 7, 2025 at 1:00 AM EST

Closed 638 days ago. Posted February 3, 2025, first published January 30, 2025. Scheduled to archive February 22, 2025.

Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities

This one closed in 2025

2 like it are open now in industrial machinery and equipment merchant wholesalers

  • POWER CONTROL UNIT,TRA

    Defense Logistics Agency, DLA Troop Support

    Combined synopsis and solicitationSmall businessNAICS 423830Anywhere in the USSPE8EE27T0346
    Closes in 3 daysNov 9
  • Various Maintenance Parts

    Department of the Army, W076 Endist Middle Eas

    Combined synopsis and solicitationNAICS 423830Anywhere in the USW912ER26QA005
    Closes in 17 daysNov 24

Description

As published on SAM.gov.

The Coast Guard requires the supply of two (2) Solid waste submersible pumps and one (1) control panel. No labor will be required from the vendor.

SCOPE OF WORK: Contractor shall furnish two (2) Barnes SH model number 3SHVC50N4 submersible pumps and (1) Cox Research & Design Control Panel model number CP-5071 with four (4) level control floats. No alterations outside of the Statement of Work criteria are authorized without permission from the Contracting Officer (KO) or Contracting Officers Representative (COR)

1. PERFORMANCE REQUIREMENTS: Contractor shall furnish equipment as outline below.

All associated equipment shall be approved and designed to work with stated model number. a) Two (2) Barnes SH model 3SHVC50N4 Electric Submersible pumps 3” ANSI flange discharge 5 HP 3-phase, 480v Electrical Service Gorman Rupp guide shoe retrofit b) Cox Research & Design Duplex Alternating Control Panel, model CP-5071 NEMA 4x SS enclosure Four (4) level control floats 3-phase/480v Electrical Service 2. CONTRACT TIMELINE: The Contractor shall provide all required information and complete this contract within this time schedule, unless approved by the Contracting Officer representative. Any delays on materials or labor issues that will impede the completion of thecontract shall be documented with the Contracting Officer or their representative.

a) Provide all required submittals to the Contracting Officer or Contracting Officers Representative within 14 calendar days after contract award.

b) The U.S. Coast Guard will have 7 calendar days to review the submittals and respond to Contractor.

c) Contractor shall provide projected delivery schedule during proposal and provide a firm delivery date within 14 calendar days after the contract has been awarded.

d) The Contractor, upon receiving notification that the U.S. Coast Guard has approved the submittals and having received the Contractors firm delivery date schedule, will have 14 Calendar days to begin work on the project & 30 Calendar days to complete. The Contractor shall notify the Contracting Officer of any long lead time delivery of equipment, so that the Contracting Officer can modify the delivery date of the contract.

SUBMITTALS: Once awarded, the following list of submittals required at time of delivery and defines the specific minimum requirements for this contract. c) Manufactures Technical Publications and Guides d) Warranty Information WARRANTY: Contractor shall provide a one-year warranty for all materials. All warranty claims by the Coast Guard shall be honored by the vendor at no additional cost to the Coast Guard. Yes, equivalent brands are acceptable as long as they match the standard. The issue you may run into is the physical layout of the pump in order to mount in our lift station. I have attached pictures of the current pump.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 30, 2025

    Combined synopsis and solicitation

    Due February 7, 2025 at 1:00 AM EST. SAM.gov, notice 95ca212ad7624f758431bb1298de4050

  2. February 3, 2025

    Combined synopsis and solicitation

    Due February 7, 2025 at 1:00 AM EST. SAM.gov, notice 093bfa86335d4b8ba2ff3e2a40dbcbfb

Points of contact