Combined synopsis and solicitation, total small business set-aside
Replace Boiler and Hot Water Heater at Coast Guard Thomaston Housing
70Z02424QBOSTNNE05
US Coast Guard, Base Boston. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
May 24, 2024 at 1:00 PM EDT
Closed 847 days ago. Posted May 16, 2024, first published May 10, 2024. Scheduled to archive June 8, 2024.
Description
As published on SAM.gov.
This project involves removing and disposal of existing boiler and indirect fired hot water heater and install a new boiler and indirect fired hot water heater that meets or exceeds existing BTU and capacities. Currently a model BL3R-70 82k BTU Pensatti Boiler and a SuperStor Ultra Model #SSU-45 Stainless Steel Indirect Fired Water Heater is installed.
Contractor shall ensure compatibility and make connection to the existing power supply, heating system, domestic hot and cold water with new ball valves: as well as connection to the chimney and fuel supply. Contractor shall consider any needed upgrades to ensure installation is to code. Take any additional steps needed to bring the system back online to include filling, purging, starting the new system, and making any adjustments needed to confirm proper operation of the heating and hot water systems. See attached SOW for full details.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Kara A. Daviskara.a.davis@uscg.mil2077415487
- Harrison StanleyHarrison.G.Stanley@uscg.mil2072444201
Also open from this buyer
- Purchase of 49ft Self-Drive Work PlatformCombined synopsis and solicitationNAICS 333923New Haven, CT70Z02426Q0000064Closes todaySep 18
- Colchester Lathe maintenanceCombined synopsis and solicitationSmall businessNAICS 333991Boston, MA70Z02426Q0000179Closes in 3 daysSep 21