Skip to content
Abierto

Combined synopsis and solicitation, total small business set-aside

Replace Boiler and Hot Water Heater at Coast Guard Thomaston Housing

70Z02424QBOSTNNE05

US Coast Guard, Base Boston. Plumbing, Heating, and Air-Conditioning Contractors.

Response deadline

May 24, 2024 at 1:00 PM EDT

Closed 847 days ago. Posted May 16, 2024, first published May 10, 2024. Scheduled to archive June 8, 2024.

Description

As published on SAM.gov.

This project involves removing and disposal of existing boiler and indirect fired hot water heater and install a new boiler and indirect fired hot water heater that meets or exceeds existing BTU and capacities. Currently a model BL3R-70 82k BTU Pensatti Boiler and a SuperStor Ultra Model #SSU-45 Stainless Steel Indirect Fired Water Heater is installed.

Contractor shall ensure compatibility and make connection to the existing power supply, heating system, domestic hot and cold water with new ball valves: as well as connection to the chimney and fuel supply. Contractor shall consider any needed upgrades to ensure installation is to code. Take any additional steps needed to bring the system back online to include filling, purging, starting the new system, and making any adjustments needed to confirm proper operation of the heating and hot water systems. See attached SOW for full details.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 10, 2024

    Combined synopsis and solicitation

    Due May 17, 2024 at 1:00 PM EDT. SAM.gov, notice 097ca844e4514985bb8e723f5e8ed6b3

  2. May 16, 2024

    Combined synopsis and solicitation

    Due May 24, 2024 at 1:00 PM EDT. SAM.gov, notice abb47ee357ee42088a6087959a626b82

Points of contact