Combined synopsis and solicitation
Existing Roadway Paving / IOF St. Thomas, USVI
70FBR226Q00000037-updated
Federal Emergency Management Agency, Region 2. Highway, Street, and Bridge Construction.
Response deadline
September 29, 2026 at 3:00 PM EDT
Closed 33 days ago. Posted September 28, 2026, first published September 28, 2026. Scheduled to archive September 30, 2026.
Get the next one like this from Federal Emergency Management Agency by email, the day it is posted.Find my opportunities
This one closed 33 days ago
36 like it are open now in highway, street, and bridge construction
- FY27 NRM - Correct Mather Loop Road and Install Speed Bumps
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 237310Mather, CA36C26127Q0112Closes tomorrowNov 2 - BRCA 310427 Southbound Shuttle Stop
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237310Utah140P2026R0065Closes in 2 daysNov 3 - TX FW LGA 10(5) Steve Thompson Wildlife Drive
Federal Highway Administration, 6982AF Central Federal Lands Divisi
SolicitationSmall businessNAICS 237310Los Fresnos, TX6982AF27B000006Closes in 2 daysNov 3
Description
As published on SAM.gov.
The purpose of this requirement is to improve the roadway system at the FEMA St. Thomas Initial Operating Facility (STT IOF), also known as the Mosquito Point Complex (MPC), located in St. Thomas, U.S. Virgin Islands.
The work includes site assessment, site preparation, subgrade preparation, compaction, proof rolling, resurfacing existing asphalt roadways, and paving the dirt/gravel access road leading to Communications Bunker #3. The project also includes an add/deduct alternate for paving the dirt/gravel access road leading to Bunker #2.
These improvements are required to enhance safety, support heavy vehicle and forklift traffic, improve operational access, reduce roadway hazards, and support FEMA mission operations.
The FEMA STT IOF/MPC is located at the end of Mosquito Point in St. Thomas, U.S. Virgin Islands. The facility consists of approximately 20 acres of multi-level rocky terrain in a tropical environment and includes approximately one mile of roadways and approach ways.
The site contains approximately:
- 0.45 miles of concrete roads
- 0.39 miles of asphalt roads
- 0.14 miles of dirt/gravel roads
FEMA requires resurfacing of the existing asphalt roadways and paving of the dirt/gravel access road to Communications Bunker #3. The Bunker #3 access road is mission critical and has been the location of two recorded forklift accidents, including one where the driver was ejected.
Most existing asphalt roadways were recently trenched for underground electrical power and fiber conduit installation. These trenched areas require preparation, subgrade placement, compaction, proof rolling, and resurfacing.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 70FBR226Q00000037 updated Final v1 0928 26.pdf2.3 MB, September 29, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 29, 2026
Combined synopsis and solicitation
Due September 28, 2026 at 3:00 PM EDT. SAM.gov, notice 04ce0b5e5aad45a9b01b12fce2415e27
2 revisions on SAM
- September 29, 2026: publish, combined synopsis and solicitation
- September 29, 2026: publish, combined synopsis and solicitation
September 29, 2026
Combined synopsis and solicitation
Due September 29, 2026 at 3:00 PM EDT. SAM.gov, notice 9012aadef24e4365bac1289ff0ae0879
2 revisions on SAM
- September 29, 2026: publish, combined synopsis and solicitation
- September 29, 2026: publish, combined synopsis and solicitation
Points of contact
- Victor M Perez-Moravictor.perez-mora@fema.dhs.govN/A
- Cheryl Martin Liburdcheryl.martinliburd@fema.dhs.govN/A