Solicitation
Femtosecond Laser System
6-S176-Q-00378-00
Department of Energy, Argonne Natl Lab - DOE Contractor. Semiconductor and Related Device Manufacturing.
Response deadline
August 7, 2026 at 1:00 PM EDT
Closed 86 days ago. Posted July 31, 2026. Scheduled to archive August 7, 2026.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2026
25 like it are open now in semiconductor and related device manufacturing
- HEATER,THERMAL RELEASE
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 334413Anywhere in the USSPE7M527T1295Closes in 2 daysNov 2 - PANEL,BODY,VEHICULAR
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 334413Anywhere in the USSPE7L327T1292Closes in 2 daysNov 2 - SEMICONDUCTOR DEVICE,D
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 334413Anywhere in the USSPE7M527T1291Closes in 2 daysNov 2
All 25 open in semiconductor and related device manufacturing
Description
As published on SAM.gov.
EVALUATION IS BASED ON LOWEST PRICE, TECHNICALLY ACCEPTABLE CRITERIA
Argonne National Laboratory is seeking a Femtosecond Laser System, including installation and on-site operator training, for use at Argonne National Laboratory (ANL).
Please review the Request for Quotation ANL-70 dated July 31, 2026, and all attached technical requirements for the complete required system capabilities, and provide documentation and evidence to support the offeror’s adherence to the requirements no later than 12:00 PM CDT on August 7, 2026.
We will need a response to the following documentation and considerations:
-
Completed and signed ANL-70 Request for Quotation
-
List of capabilities aligned with the Technical Requirements, including evidence demonstrating compliance with the required specifications for the fully integrated femtosecond laser system, installation, and on-site operator training
-
Country of Origin*
-
Lead time from Purchase Order to final delivery to Argonne, FOB Destination / DAP Lemont, IL 60439, including proposed schedule for delivery, installation, and on-site operator training
-
Completed and signed ANL-70B Reps and Certs
Please send any questions to the Contracting Officer, Molly Hunter, at mollyhunter@anl.gov. We are looking forward to reviewing your offer.
* Country of Origin should be consistent with the definition stated in FAR 52.225-1, Buy American—Supplies, in which “the cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind as those that the agency determines are not mined, produced, or manufactured in sufficient and reasonably available commercial quantities of a satisfactory quality are treated as domestic. Components of unknown origin are treated as foreign.”
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Special Cl-Progress Pmts-02-SEP-2015.PDF22 KB, July 31, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 31, 2026
Solicitation
Due August 7, 2026 at 1:00 PM EDT. SAM.gov, notice 114e59b2e30647f4817076db7be521fa
1 revisions on SAM
- July 31, 2026: publish, solicitation
Points of contact
- Molly Huntermollyhunter@anl.gov6302523094