CO BR UCPO Blue Mesa Road(1) Blue Mesa Road
6982AF27B000009
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.
Status
Presolicitation
Posted October 27, 2026, first published October 20, 2026. Scheduled to archive December 1, 2026.
Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities
This one is not taking offers
36 like it are open now in highway, street, and bridge construction
- Paving Acquisition Vehicle - Rockies (PAV-R) IDIQ Sources Sought
Department of the Air Force, FA2550 50 Cons PKP
Sources soughtSmall businessNAICS 237310Colorado Springs, COFA2550PAVRCloses in 20 daysNov 20 - Administrative Parking Lot Repairs
Forest Service, Usda-Fs, Csa Intermountain 8
SolicitationSmall businessNAICS 237310Colorado1240LT27Q0019Closes in 23 daysNov 23 - GAOA Brainard Lake Recreation Area Deferred Maintenance
Forest Service, USDA Forest Service
Combined synopsis and solicitationSmall businessNAICS 237310Ward, CO1240LT27Q0004Closes in 47 daysDec 17
Description
As published on SAM.gov.
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
PROJECT NAME: CO BR UCPO Blue Mesa Road(1) Blue Mesa Road
Blue Mesa Road is a 1.44-mile corridor located in Gunnison County, CO and provides access to the Bureau of Reclamation (BOR) Power Plant and Pine Creek Trailhead recreational activities on the Curecanti National Recreational Area.
SCOPE OF THE WORK
Schedule A: Proposed rehabilitation of 0.86 miles to replace existing gravel roadway with asphalt concrete pavement. Reconstruction/Rehabilitation, as needed, for 0.24 miles of existing asphalt to incorporate raising roadway profile at US 50 intersection, drainage improvements including replacement and/or lining of damaged culverts, relocation of traffic counters, formalize parking area with ADA stalls, signing and striping, ditch reconditioning, rockfall mitigation.
Option X: Proposed rehabilitation of 0.34 miles to replace existing gravel roadway with asphalt concrete pavement from BOR gate to Blue Mesa Power Plant, drainage improvements to include replacement of damaged culverts, signing and striping, ditch reconditioning, installation of 6” electrical conduit for purposes of future automatic gate installation.
Option Y: Proposed 6-inch electric conduit installation and 2 ft x 2 ft max trenching for 2,215 LF miles from the electric security gate to The Blue Mesa Power Plant. Conduit will provide future access for BOR to provide electric connection to security gate.
PRINCIPAL WORK ITEMS:
Schedule A:
- 15225-0000 Slope, Reference, and Clearing and Grubbing Control: 1.051 MILE
- 20301-1900 Removal of Pipe Culvert: 5 EACH
- 20401-0000 Roadway Excavation: 1,500 CU YD
- 30201-2000 Roadway Aggregate, Method 2: 2,500 CU YD
- 30302-1000 Ditch Reconditioning: 3,280 LN FT
- 40301-0100 Asphalt Concrete Pavement, Type 1: 2,500 TON
- 60103-0140 Concrete, Headwall for 24-Inch Pipe Culvert (L-Shaped): 3 EACH
- 60103-0160 Concrete, Headwall for 30-Inch Pipe Culvert: 1 EACH
- 60103-0280 Concrete, Headwall for 66-Inch Pipe Culvert (Includes Wingwalls): 1 EACH
- 60201-0800 24-Inch Pipe Culvert: 255 LN FT
- 60201-0900 30-Inch Pipe Culvert: 45 LN FT
- 60707-1200 Lining 66-Inch Pipe Culvert (HDPE Slipline): 110 LN FT
- 60707-1300 Lining 72-Inch Pipe Culvert (HDPE Slipline): 190 LN FT
- 63401-0300 Pavement Markings, Type B, Solid: 46,000 LN FT
Option X:
- 15225-0000 Slope, Reference, and Clearing and Grubbing Control: 0.38 MILE
- 20420-0000 Embankment Construction: 200 CU YD
- 30201-2000 Roadway Aggregate, Method 2: 700 CU YD
- 40301-0100 Asphalt Concrete Pavement, Type 1: 650 TON
- 56603-0000 Reinforced Shotcrete: 180 SQ YD
- 60704-0000 Cleaning Culvert in Place: 7 EA
- 63401-0300 Pavement Markings, Type B, Solid: 8,500 LN FT
Option Y:
- 63610-3410 Conduit, 6-Inch, HDPE (Schedule 40): 2,215 LN FT
- 63621-1000 Utility Box, Pullbox: 6 EA
- 63622-0000 Utility Trench: 2,215 LN FT
ANTICIPATED SCHEDULE
Advertisement: November 2026
Award: January 2027
NTP: April 2027
Construction: May 2027- October 2027
ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000
A NON-MANDATORY PRE-BID SITE VISIT WILL BE HELD NOVEMBER 4TH, 2026 AT 10:00AM. PLEASE SEE ATTACHEMENTS FOR ADDITIONAL INFORMATION
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- PreBid Contractor Site Investigation - NOTICE TO BIDDERS (1) (1).pdf90 KB, October 20, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 20, 2026
Presolicitation, originally sources sought
SAM.gov, notice a161f76c94394a8393d040fef7cc67ea
2 revisions on SAM
- October 20, 2026: publish, presolicitation
- August 4, 2026: publish, sources sought
October 27, 2026
Presolicitation
SAM.gov, notice fdc5590ebeab4fcfab76ff3c55c4d95d
3 revisions on SAM
- October 27, 2026: publish, presolicitation
- October 20, 2026: publish, presolicitation
- August 4, 2026: publish, sources sought
Points of contact
- Stephanie Navarrocflacquisitions@dot.gov
- Ryan Phillipscflacquisitions@dot.gov