Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought

SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD

6982AF26SS0008

Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.

Response deadline

April 18, 2026 at 4:00 PM EDT

Closed 197 days ago. Posted April 16, 2026, first published April 3, 2026. Scheduled to archive April 19, 2026.

Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities

This one closed in 2026

36 like it are open now in highway, street, and bridge construction

All 36 open in highway, street, and bridge construction

Description

As published on SAM.gov.

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT  INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs.  Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn:  Douglas Whitcomb) for receipt by close of business (2 p.m. local Denver time) on April 20, 2026: 

(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;

(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;

(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $1 million, and your firm’s aggregate bonding capacity; and

(4) Provide a list of road construction projects of equal or greater value and scope to the SD FTFW MADI 10(2) & 9000(1), REHAB MADISON WMD HQ ROAD project in which you performed work similar in scope.  DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.

The size of a small business firm includes all parents, subsidiaries, affiliates, etc.  Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.  All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/

PROJECT DESCRIPTION: 

The scope of this project includes pavement reconstruction to the approach road and parking lot for the Madison Wetland Management District (WMD) Headquarters and the United States Fish and Wildlife Service (USFWS) Visitor Center. The designed pavement section is proposed to be 3.5 inches of asphalt concrete pavement (ACP) over 4 inches of aggregate base material. The proposed parking lot will be installed at grade with the adjacent sidewalk and concrete trail. The project will improve safety and mobility for staff and visitors by providing improved access to and parking for the Payne Waterfowl Production Area (WPA). The pavement improvements will also extend the service life of the access road and parking lot wearing surfaces.

SUMMARY SCOPE OF THE WORK: 

The existing two-way, single-lane operation of the access road will be preserved by constructing a consistent 14-foot roadway section. Pavement reconstruction will also address the approach road apron on the left side of the roadway between stations 106+02 and 106+74.

The project also includes full reconstruction of the existing parking lot and the asphalt apron on its east side, which connects to the concrete trail leading to the visitor center’s east entrance. The updated pavement marking layout will provide eight 10-foot by 20-foot parking stalls with one accessible stall on the north side, and ten 10-foot by 20-foot stalls on the south side. The northern edge of the parking area will maintain its existing tie-in elevation with the 6-foot sidewalk, and the parking surface will be regraded to a uniform 1.75% cross slope, removing the existing centerline grade break.

PRINCIPAL WORK ITEMS:

  • 20401-0000 Roadway Excavation: 550 CUYD
  • 20402-0000 Subexcavation: 200 CUYD
  • 30202-2000 Roadway Aggregate, Method 2: 600 TON
  • 40301-0000 Asphalt Concrete Pavement, 500 TON

ANTICIPATED SCHEDULE: 

The anticipated advertisement date for the project is May 2026 with construction anticipated from July 2026 to October 2026. 

DISCLOSURE OF MAGNITUDE: 

The estimated price range is between $500,000 and $1,000,000.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 3, 2026

    Sources sought

    Due April 15, 2026 at 4:00 PM EDT. SAM.gov, notice 8165307322524bbcb2752da454dad435

    2 revisions on SAM
    • April 16, 2026: publish, sources sought
    • April 3, 2026: publish, sources sought
  2. April 16, 2026

    Sources sought

    Due April 18, 2026 at 4:00 PM EDT. SAM.gov, notice f61faac4b291409c801c8862df860254

    3 revisions on SAM
    • April 29, 2026: publish, presolicitation
    • April 16, 2026: publish, sources sought
    • April 3, 2026: publish, sources sought

Points of contact