Skip to content
  • 6,816 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Presolicitation

CO NP ROMO 407(1) Holzwarth Culvert

6982AF26B000012

Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.

Response deadline

September 9, 2026 at 4:00 PM EDT

Closed 52 days ago. Posted August 25, 2026. Scheduled to archive September 30, 2026.

Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities

This one closed 52 days ago

36 like it are open now in highway, street, and bridge construction

All 36 open in highway, street, and bridge construction

Description

As published on SAM.gov.

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE

PROJECT NUMBER: CO NP ROMO 407(1)

PROJECT NAME: Holzwarth Culvert

PROJECT DESCRIPTION: 

This project will replace the deficient Holzwarth Culvert (Structure No. 1520-029S), a six-barrel corrugated metal arch pipe culvert on the Holzwarth Access Road with a steel girder bridge. Located in Rocky Mountain National Park, approximately nine miles north of Grand Lake, CO, along US HWY 34 at an elevation of 8,900 feet, the culvert conveys flow from the Colorado River and provides access to the Holzwarth Historic Site. The purpose of this project is to prevent future roadway damage and flooding while maintaining access to employee housing, the historic site, and National Park Service and Forest Service recreation opportunities.

SCOPE OF THE WORK:   

The project will consist of removal of the existing six barrel culvert and construction of a new steel girder bridge with a cast in place concrete deck. New bridge abutments and micropiles. Temporary stream diversion and riprap. New aggregate roadway surfacing. Relocation of an existing electrical line. Relocation of existing historic head gates into a new concrete slab. Access to the site is through a gate at the south end of the Holzwarth Historic Site Parking Lot and along the Holzwarth Culvert Access Road. The Holzwarth Culvert Access Road is approximately 13’ wide with tight turns. Temporary widening will be necessary to prevent truck off tracking on to sensitive environmental resources. A temporary truck turnaround will also be necessary as no construction access is allowed more than 100’ west of the bridge.

PRINCIPAL WORK ITEMS:

  • 20304-2000 Removal of Bridge: 1 EACH
  • 30202-2000 Roadway Aggregate, Method 2: 120 TON
  • 55504-0000 Prefabricated Steel Bridge (10’ wide x 48’ long modular steel vehicular bridge): 1 LPSM
  • 56701-0000 Micropile (8.68” dia.): 180 LNFT
  • 62801-0000 Temporary Stream Diversion: 1 LPSM

ANTICIPATED SCHEDULE: 

Advertisement – September 2026

Award – December 2026

NTP – December 2026

Contract Completion – November 2027

ESTIMATED COST RANGE:

 Total estimated cost between $700,000 and $2,000,000.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 25, 2026

    Presolicitation, originally sources sought

    Due September 9, 2026 at 4:00 PM EDT. SAM.gov, notice 0ddf96578ea24f78be4abf3f578175c1

    3 revisions on SAM
    • September 16, 2026: publish, solicitation
    • May 29, 2026: publish, sources sought
    • August 25, 2026: publish, presolicitation