CO FLAP SH 5(1) Mount Blue Sky Highway

6982AF24B000009

Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.

Response deadline

June 20, 2024 at 4:00 PM EDT

Closed 819 days ago. Posted July 2, 2024, first published April 29, 2024. Scheduled to archive July 5, 2024.

Description

As published on SAM.gov.

PROJECT NUMBER and NAME: CO FLAP SH5(1), Mount Blue Sky Highway PROJECT DESCRIPTION: The Mount Blue Sky Highway Project proposes to reconstruct 0.7 miles of Colorado State Highway (SH) 5 in Clear Creek County, Colorado. The project is located approximately 50 miles southwest of Denver in the Arapaho and Roosevelt National Forest. SH 5 is designated a Scenic Byway and provides access to the top of Mount Blue Sky which is the highest paved road in the United States.

The project area is adjacent to Summit Lake Park located at 13,000 feet above sea level. The area receives on average 292 inches of snowfall per year with temperatures ranging from 65 to -40 degrees Fahrenheit. The project traverses between United States Forest Service and Denver Mountain Parks Lands. The project area is distressed with major subgrade failures.

The roadway was originally constructed across a wetland complex causing disruption to both surface and subsurface water flow which has led to degradation of the underlying permafrost. The Permafrost degradation and on-going solifluction have caused major damage to the roadway including settlement, subgrade failure, and cracking.

The project scope includes roadway reconstruction with a pavement section supported upon an air convection embankment (ACE) to improve subsurface drainage, minimize permafrost degradation, and stabilize the roadway. The ACE will be constructed to an approximate maximum depth of 4’ to 5’ and will consist of rock ranging from 4” to 12” in diameter.

Additional salient project features include removal and replacement of culverts, installation of an aquatic organism passage culvert, vegetation salvage and placement, sub excavation, aggregate subgrade, and asphalt paving.

PRINCIPAL WORK ITEMS: 20,000 cubic yards of embankment construction including rock embankment 2,000 tons of aggregate base 2,000 tons of asphalt concrete pavement 200 linear feet of metal pipe culverts 4000 square yards of salvaging/placing conserved topsoil 5 miles pavement markings, type b ANTICIPATED SCHEDULE: It is anticipated construction will start approximately July 2024 and finish approximately October 2025. ESTIMATED COST RANGE: The anticipated cost range is between $5,000,000 and $10,000,000.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 29, 2024

    Presolicitation, originally sources sought

    SAM.gov, notice 9ed788c9c85749e6af7588cf6a547171

  2. May 20, 2024

    Solicitation, originally presolicitation

    Due June 20, 2024 at 4:00 PM EDT. SAM.gov, notice 457fefa893a6477789ebbca64e01cf9f

  3. June 5, 2024

    Solicitation

    Due June 20, 2024 at 4:00 PM EDT. SAM.gov, notice 98ab4030b72b4be98075dc76ca32ee24

  4. June 12, 2024

    Solicitation

    Due June 20, 2024 at 4:00 PM EDT. SAM.gov, notice 74abbd008b0a4fa3a913c969d30f08ad

  5. June 17, 2024

    Solicitation

    Due June 20, 2024 at 4:00 PM EDT. SAM.gov, notice a2a637fc9ead4999a2acc125aa2cf9ac

  6. June 20, 2024

    Solicitation

    Due June 20, 2024 at 4:00 PM EDT. SAM.gov, notice 7ee98486af744e728e9aea97a9b9095c

  7. July 2, 2024

    Solicitation

    Due June 20, 2024 at 4:00 PM EDT. SAM.gov, notice 929a3f3f59f8494983dd1d564877a820

Points of contact