Solicitation, total small business set-aside
Solicitation DUE DATE EXTENSION - ASR-9 Centrifugal Blowers - MMAC OKC
6973GH-25-Q-00157_ASR-9_Blowers
Federal Aviation Administration, 6973GH Franchise Acquisition SVCS. Other Electronic Component Manufacturing.
Response deadline
August 21, 2025 at 1:00 PM EDT
Closed 393 days ago. Posted August 15, 2025, first published July 24, 2025. Scheduled to archive September 5, 2025.
Description
As published on SAM.gov.
2. SCOPE OF WORK The contractor must furnish all labor, facilities, equipment, and materials to procure and upgrade the Kooltronics Blowers for the FAA as outlined in each section that follows. The specific quantities of units include the following:
1. One Hundred (100) H03 Exhaust Blowers - K3BB58-3 2. One Hundred (100) H01 Centrifugal Blowers - K3BB58-2 3. Ship Blowers to Electro Mechanex LLC to perform the following updates:
a. Dismantle, Clean Parts & Inspect all components.
b. Check Windings for condition and integrity (Resistance, Hi-Pot, Surge Comparison Inductance testing & Ground Capacitance).
c. Measure all Mechanical fits and record the dimensions.
d. Dynamically Balance Rotor/Blower to a balance quality grade G2.5 (ISO 1940-1), for reduced vibration during operation.
e. Bore & Sleeve DE/NDE Endbell to Mfg specifications.
f. Fit Bearings in accordance with ABMA fitting procedures.
g. Clean and Bake Windings with fresh BMG Polyurea EM lubricant.
h. Assemble Motor and Test run at full rated voltage at 60HZ for full output speed.
i. Record and Document All Electrical and Mechanical test measurements.
j. Spray Paint the Motor Machinery Gray.
k. Re-machine motor end bearing cups; adding steel sleeves and precisely locating center to reduce electromagnetic force (EMF) imbalance.
l. Bearing Upgrade: Premium NTN Sealed Ball Bearing C3 m. Install high temperature, bearing thrust washers. n. Bearing lubricant (BMG Gen 2 Polyurea Motor Grease) rated for temperatures above 200°F o. Blowers dynamically balanced to a G2.5 grade. p. Add grommets to the mounting holes on the flange. 3. REQUIREMENTS 3.1 Production Units Delivery of production units shall begin NLT 300 days after receipt of order. 4. PREPARATION FOR DELIVERY 4.1 Preservation, Packaging, and Packing Preservation, packaging, and packing shall be IAW Provision 61.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 24, 2025
Solicitation
Solicitation - ASR-9 Centrifugal Blowers - MMAC OKC
Due August 1, 2025 at 1:00 PM EDT. SAM.gov, notice 712161b7d60f47068b0d19effb4c3bc5
July 29, 2025
Solicitation
Solicitation - ASR-9 Centrifugal Blowers - MMAC OKC
Due August 15, 2025 at 1:00 PM EDT. SAM.gov, notice bb97492b4992463c95afbf061ab3adf4
August 15, 2025
Solicitation
Solicitation - ASR-9 Centrifugal Blowers - MMAC OKC
Due August 21, 2025 at 1:00 PM EDT. SAM.gov, notice 6321e493087b4bb08928559117ca02e3
August 15, 2025
Solicitation
Due August 21, 2025 at 1:00 PM EDT. SAM.gov, notice caf86a83659e4cec86829bfb73b54203
Points of contact
- Raymond Lenaraymond.a.lena@faa.gov
Also open from this buyer
- Sources Sought for Powered Lift Initial and Recurrent Pilot Qualification TrainingSources sought6973GH-26-R-PoweredliftCloses todaySep 18
- FAA Market Survey /Request for Information / Capability Assessment: Procurement of Power Systems Battery Replacement IVSources soughtNAICS 335916973GH-26-RFI-PSBRIVCloses in 4 daysSep 22
- Gulfstream G280 Initial and Recurrent Pilot Qualification TrainingSources soughtNAICS 611512Oklahoma City, OK6973GH-27-R-GulfstreamG280Closes in 6 daysSep 24
- INVESTIGATIVE INTERVIEWING TRAINING COURSESolicitationNAICS 611519Oklahoma City, OK6973GH-26-R-00229Closes in 10 daysSep 28
- FAA Industry Engagement Event - Oct 13-15, 2026 - Aviation Spectrum Interference Detection Solutions - Early Registration RequiredSources soughtAC-26-SPECTRUMCloses in 11 daysSep 29