Skip to content
Abierto

Presolicitation, total small business set-aside

OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead

69056726B000009

Federal Highway Administration, 690567 Western Federal Lands Div. Highway, Street, and Bridge Construction.

Status

Presolicitation

Posted July 15, 2026. Scheduled to archive July 15, 2028.

Description

As published on SAM.gov.

PROJECT: OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead LOCATION: 4 miles west of Hood River, OR WORK: This project consists of a new multi-use trail, precast concrete arch culvert, clearing, excavation, grading, drainage, aggregate-base, asphalt surface course, temporary traffic control and permanent signage and striping. See “Project Description” posted under Attachments for additional details.

LENGTH: 0.3 miles TENTATIVE COMPLETION DATE:

Late Winter/Spring 2028 CONTRACT TYPE: Sealed Bid, firm-fixed-price ESTIMATED PRICE RANGE: Between $5,000,000 and $10,000,000.

INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. THIS SOLICITATION IS OFFERED AS A SMALL BUSINESS SET-ASIDE. This project is anticipated to be solicited Fall/Winter 2026 To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 15, 2026

    Presolicitation

    SAM.gov, notice 56bc6fa3003b4266ba4f8a80fc27e0b3

Points of contact