Skip to content
Abierto

Sources sought

ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area

690567-24-SS-0021

Federal Highway Administration, 690567 Western Federal Lands Div. Highway, Street, and Bridge Construction.

Response deadline

August 2, 2024 at 5:00 PM EDT

Closed 776 days ago. Posted July 3, 2024. Scheduled to archive August 17, 2024.

Description

As published on SAM.gov.

This is a Sources Sought Notice for proposed project ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area. See Sources Sought Notice under attachments for how to respond to this notice. The proposed contract action is for a firm-fixed-priced construction contract.

The primary objective of the proposed project is to rehabilitate approx. 2.7 miles of the Crown Point Trail on Lake Cascade with grading to provide an accessible trail with an engineered surface and drainage, and to rehabilitate and address erosion prone areas. Also included is an improved vehicle turnaround, gate closure, and trailhead formalized parking area with engineered surface and designated accessible parking. Work includes trail construction, trail resurfacing, slope repair, and paving.

The project is located 69 miles north of Boise, Idaho in Valley County. NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $45 million.

Estimated Price Range: Between $700,000 and $2,000,000.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 3, 2024

    Sources sought

    Due August 2, 2024 at 5:00 PM EDT. SAM.gov, notice 079f1f5a5a164989b501183cc14580b5

Points of contact