Skip to content
Abierto

Solicitation

Estimating the Cost of a Manufacturing Plant for LFP Cathode Materials

4-P127-P-00166-00

Department of Energy, Argonne Natl Lab - DOE Contractor. Other Scientific and Technical Consulting Services.

Response deadline

April 22, 2024 at 6:00 PM EDT

Closed 878 days ago. Posted April 8, 2024. Scheduled to archive May 7, 2024.

Description

As published on SAM.gov.

The objective of this study is to estimate the design and cost of setting up and operating a large-scale plant in the United States to produce LFP and LFMP materials. Estimates for three plant sizes should be provided: 40, 80, and 120 kilo-tonne/yr. The plants should be capable of producing powders that incorporate state-of-the-art materials in anticipation of demand in ~5 years. The design and cost estimates will be incorporated into ongoing techno-economic analyses at Argonne National Laboratory.

The Request for Proposal (RFP) document and the Statement of Work are included in this posting. The other documents referenced in the RFP have been uploaded to a BOX folder accessible through the following link: https://anl.box.com/s/3csqj9wgbx35vyggvmf1u7rn84rtpuqs which is password protected. In order to obtain the password for this BOX folder please email the Procurement Official: Greg Sawicki at gsawicki@anl.gov.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 8, 2024

    Solicitation

    Due April 22, 2024 at 6:00 PM EDT. SAM.gov, notice 452644d0b13e48bab347035b942c593a

Points of contact