Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Solicitation

Fiji G2 Plasma ALD System

4-B176-Q-00467-00

Department of Energy, Argonne Natl Lab - DOE Contractor. Other Professional Equipment and Supplies Merchant Wholesalers.

Response deadline

May 21, 2024 at 1:00 PM EDT

Closed 894 days ago. Posted May 15, 2024. Scheduled to archive May 21, 2024.

Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities

Description

As published on SAM.gov.

Argonne National Laboratory is seeking a Fiji Gen 2 Plasma ALD System with the following critical features: Capable of deposition on 200 mm wafers. Can deposit high quality superconducting nitrides that have the following critical properties: (1) Low resistivity: (p(µOhm.cm) <= 100 for TiN and <= 200 for NbN), and (2) Superconductivity as deposited with a high transition temperature: Tc >= 3.8K for TiN and >= 13.8K for NbN.

Remote plasma source with working distance of >25cm from substrate to enable ion-rich and radical rich conditions. Hot wall reactor with ability to integrate in-situ diagnostics such as ellipsometry, QCM and/or residual gas analyzer(RGA)/mass spectrometer(MS). Walltemperature of the reactor must be able to be independently controlled up to 300°C.

System must have a single input into the chamber for precursors in order to maintain the shortest path length into the reactor; precursor inputs must be via a 3-way ALD valve, constantly purged with inert gas and manifolded into a single input point into the reactor. The plasma source must not require water cooling for the automatching network. A Seren RF power supply and matching network is strongly preferred.

For minimized gas consumption the standard, recommended idle consumption of the system must be less than 60 sccm total gas flow of Ar/N2. Please provide the below no later than the offer deadline: 1. Completed and signed ANL-70 Request for Quotation (OK to include technical specifications on a separate proposal) 2. Completed and signed ANL-70B Pre-Award Information 3. Price justification as stated in ANL-70 Request for Quotation document 4. Country of Origin confirmation

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 15, 2024

    Solicitation

    Due May 21, 2024 at 1:00 PM EDT. SAM.gov, notice 5d2212c59c4842ca89a320bb9775f7b6

Points of contact