Skip to content
Abierto

Combined synopsis and solicitation, total small business set-aside

Crawlspace Water Mitigation - Piegan LPOE-Babb

47PD5526R0039

Public Buildings Service, PBS Project Delivery West - Branch E. Commercial and Institutional Building Construction.

Response deadline

July 10, 2026

Closed 68 days ago. Posted June 18, 2026. Scheduled to archive July 25, 2026.

Description

As published on SAM.gov.

The Piegan LPOE Port has water accumulation under the main port building that needs to be mitigated. This will be accomplished by the installation of French drain system around the perimeter of the building foundation footings. French drains once installed will empty into contractor supplied sump pumps to collect water to be pumped out into the storm drain system. A new vapor barrier will be installed to damper any ground source water evaporation from occurring under the building.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 18, 2026

    Combined synopsis and solicitation

    Due July 10, 2026. SAM.gov, notice fdf88e9ccd784eb884c6465c589dca2d

Points of contact