Skip to content
  • 6,812 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Award notice, service-disabled veteran-owned small business set-aside, first published as presolicitation

HVAC Cooling Towers Testing and Maintenance for VA Palo Alto Health Care System

36C26126Q0576

Department of Veterans Affairs, 261-Network Contract Office 21. Testing Laboratories and Services.

Awarded

Ewa Direction Inc.

$238,038.84 obligated so far on USAspending

Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities

This one was awarded in 2026

23 like it are open now in testing laboratories and services

All 23 open in testing laboratories and services

Description

As published on SAM.gov with the solicitation of May 20, 2026.

Question and Answer What is the system volume of each CT? The specifications vary depending on the cooling tower. Please refer to the make and model information outlined in the Performance Work Statement, Scope of Work, or inventory for these details. What are the cubic feet of each CT (including underground sumps)? Please refer to the make and model information provided in the inventory. For PAD (VA Palo Alto), Building 100, the cooling tower sump dimensions are 25 feet by 44 feet, with an approximate depth of 6 feet. What is the annual average continuous cooling tonnage for each CT? It varies depending on the location. Please refer to the Performance Work Statement or Scope of Work for further details. Who owns the existing chemical tanks, chemical pumps, and water treatment controllers? The VA owns the existing water treatment controllers, chemical base tanks, and chemical pumps. Should the cost of new water treatment controllers, chemical base tanks, and chemical pumps be included in the bid? The VA owns the existing water treatment controllers, chemical base tanks, and chemical pumps; therefore, the cost of these systems should be excluded. What is the current chemical delivery process? What package size is used for chemical base tanks, and who is responsible for transfer into the base tanks? The contractor shall be responsible for determining the appropriate size of the chemical base tank at each location, as well as for the delivery of chemicals and their transfer into the base tanks. What are the closed-loop volumes, and should the cost of biocide treatment be included? The VA is unable to provide this information currently. The contractor may need to utilize estimation tools to approximate the volume of these closed loops. Additionally, chemicals may be added incrementally until the required parts per million (ppm) of corrosion inhibitor are achieved. What is the approximate annual closed-loop makeup water volume for determining inhibitor treatment demand? We do not have a specific number for this, as it fluctuates frequently due to leaks and ongoing maintenance activities. The demand for inhibitor treatment will vary in accordance with the condition of the loop at any given time. Water samples could not be obtained during the site survey. Please provide the cooling water makeup quality or target cycles for cooling water makeup quality or target cycles at this time. All cooling towers and closed loops are currently maintained in accordance with VA HVAC standards and are operating within established limits. At this time, we are unable to provide detailed information; however, a sample report may be made available to the awardee following contract award, in accordance with the Performance Work Statement or Scope of Work. Will the onsite team pull samples for Nalco field water testing? No, the contractor (awardee) representative will be responsible for collecting, analyzing, and reporting sample data as required by the contract. VA representatives will not collect samples on behalf of the contractor. Can we propose monthly CT service with a smart controller and continuous remote monitoring as a substitute for weekly non-connected controllers? No. The contractor s representative is required to perform testing in person to ensure that all aspects of the system are thoroughly evaluated, and so that the technician can observe and report any changes to the COR for awareness. Please refer to the Performance Work Statement or Scope of Work for this contract for additional details. Can we use third-party chemical drum drop-off delivery? It is preferred and recommended that the contractor (awardee) receive and store chemical deliveries at their local site, as the VA will not be responsible for any missing or stolen deliveries. Could you provide the model and SN? Please refer to the Performance Work Statement or Scope of Work for a detailed inventory, which includes make and model information. Could you provide information on the sort of testing and maintenance you are looking for? Please refer to the Performance Work Statement or Scope of Work for this contract for detailed information regarding the maintenance checklist for cooling towers (CT) on a monthly, quarterly, and annual basis, as well as the types of tests required for cooling towers and closed loops. Do they want a rep onsite for weekly testing?  Yes, it is required as per contract. Will a total of 20 samples be collected from the entire campus or 20 samples from each individual building? Please refer to the Performance Work Statement or Scope of Work for information regarding the number of loops and cooling towers, as well as the total number of samples to be collected. Samples are to be obtained from various buildings, campuses, or locations.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
ZHAMN7JMA791
CAGE
6TM80
Vendor location
Honolulu, HI
Contract
36C26126P0786, purchase order
Obligated
$238,038.84, potential $1,259,680
Actions
1 between June 29, 2026 and June 29, 2026
Competition
Competed Under SAP, 3 offers received
Set-aside reported
Service Disabled Veteran Owned Small Business SET-ASIDE
Described as
HVAC Cooling Tower Testing and Maintenance
Match
award number 36C26126P0786 equals the contract number; same awarding office 36C261 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 23, 2026

    Presolicitation

    HVAC Cooling Towers Testing and Maintenance

    Due May 19, 2026 at 6:00 PM EDT. SAM.gov, notice 5b17e3e5f7fe435fb1410b4ac29c83e4

    2 revisions on SAM
    • April 23, 2026: publish, presolicitation
    • April 23, 2026: publish, solicitation
  2. April 23, 2026

    Solicitation

    HVAC Cooling Towers Testing and Maintenance

    Due May 19, 2026 at 6:00 PM EDT. SAM.gov, notice e58b10d949a446779840b60ae45fb293

    4 revisions on SAM
    • May 20, 2026: publish, solicitation
    • May 18, 2026: publish, solicitation
    • April 23, 2026: publish, solicitation
    • April 23, 2026: publish, solicitation
  3. April 23, 2026

    Solicitation, originally presolicitation

    HVAC Cooling Towers Testing and Maintenance

    Due May 19, 2026 at 6:00 PM EDT. SAM.gov, notice f7d11898e82b4669ac16d017023131a4

    5 revisions on SAM
    • April 23, 2026: publish, presolicitation
    • May 20, 2026: publish, solicitation
    • May 18, 2026: publish, solicitation
    • April 23, 2026: publish, solicitation
    • April 23, 2026: publish, solicitation
  4. May 18, 2026

    Solicitation

    HVAC Cooling Towers Testing and Maintenance

    Due May 27, 2026 at 6:00 PM EDT. SAM.gov, notice c84f1bef45324ca2b226dab6e3ec3caf

    4 revisions on SAM
    • May 20, 2026: publish, solicitation
    • May 18, 2026: publish, solicitation
    • April 23, 2026: publish, solicitation
    • April 23, 2026: publish, solicitation
  5. May 20, 2026

    Solicitation

    HVAC Cooling Towers Testing and Maintenance

    Due May 27, 2026 at 6:00 PM EDT. SAM.gov, notice e83ebc00fa884422b7bd83e7db86b7e0

    4 revisions on SAM
    • May 20, 2026: publish, solicitation
    • May 18, 2026: publish, solicitation
    • April 23, 2026: publish, solicitation
    • April 23, 2026: publish, solicitation
  6. June 29, 2026

    Award notice

    Awarded to Ewa Direction Inc. for $1,259,680. SAM.gov, notice c8bb8441c7db4030aff49b3ac8fca88c

    1 revisions on SAM
    • June 29, 2026: publish, award notice

Points of contact