Special notice, service-disabled veteran-owned small business set-aside, first published as solicitation
Building Automation Support (BAS) Vancouver WA and Portland Oregon VA Medical Centers.
36C26026Q0816
Department of Veterans Affairs, 260-Network Contract Office 20. Facilities Support Services.
Awarded
$230,235.20 obligated so far on USAspending
Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities
This one was awarded in 2026
36 like it are open now in facilities support services
- NUWC Keyport Moving Services
Department of the Navy, Naval Undersea Warfare Center
Combined synopsis and solicitationSmall businessNAICS 561210Keyport, WAN0025327Q0002Closes in 5 daysNov 5 - H379 Mann-Grandstaff VA Medical Center Kitchen Equipment Regular Maintenance and Repairs
Department of Veterans Affairs, 260-Network Contract Office 20
Combined synopsis and solicitationNAICS 561210Spokane, WAMann-Grandstaff VA Medical Center36C26027Q0088Closes in 6 daysNov 6 - R10 Lab: Region 10 Manchester Laboratory Facility
Environmental Protection Agency, Region 7 Contracting Office
SolicitationSDVOSBNAICS 561210Port Orchard, WA68HE0726R0038Closes in 23 daysNov 23
Description
As published on SAM.gov.
Solicitation: 36C26026Q0816
Amendment number: 0001
Offer due date extended to 8/28/2026 due to vendors questions.
Solicitation: 36C26026Q0816
Amendment number: 0002
Questions from vendors
________________________________________________________________________________________________________
Below are questions from various vendors. The CO attempted to get all of the questions answered from the COR.
Kick-Off What is the anticipated timeline for contract award and contract kickoff? 30-45 days
Estimated contract award is estimated to be 8/31/2026 – 9/4/2026.
Contract Kickoff is estimated to be 9/7/2026 – 9/11/2026.
How long will the awardee have to staff and start first months service?
- Answer: Unknown / This will be discussed at the kickoff meeting
Scope and System Depth (PWS 1.2, 1.5.a-b) The PWS states maintenance and service will be performed "throughout the two campuses as applicable," but does not quantify the system footprint.
- Is there a hardware list for the supervisory panels and firmware?
- Answer: Unknown / This will be discussed at the kickoff meeting
- What is the approximate device/point count at each campus?
- Answer: Unknown / This will be discussed at the kickoff meeting
- How many buildings or systems are currently under Delta control at each site?
- Answer: Unknown / This will be discussed at the kickoff meeting
- Section 1.5.a references "proactive upgrades" as part of the scope. What is the current WebCTRL/ORCAview version, and is any platform upgrade or expansion planned during the base period or option years?
- Answer: Unknown / This will be discussed at the kickoff meeting
- Are sensor calibrations required as part of the preventative maintenance scope? If so, please advise on the current workload or required frequency.
- Answer: Unknown / This will be discussed at the kickoff meeting
- Is there an incumbent providing this service?
- Answer: Unknown / This will be discussed at the kickoff meeting
- If so, please advise if current workload is on par with the 1 day per week at each site.
- Answer: Unknown / This will be discussed at the kickoff meeting
Onsite Cadence and Staffing Limits (PWS 1.5.c) The PWS specifies two days per week onsite, "or as dictated by specific needs" and notes "if any specific project requires extra attention that campus will be visited consecutively as necessary."
- Under a Firm-Fixed Price structure, an undefined requirement for consecutive visits creates unquantifiable labor risk. Will the VA establish a cap on the maximum number of hours/days per month included under the fixed base rate, with any additional site visits or after-hours dispatch (Task 5) billed under a separate emergency/overtime labor CLIN?
- Answer: Unknown / This will be discussed at the kickoff meeting
- Can you share historical trouble call volume or frequency at each site to help contractors gauge the actual staffing requirement?
- Answer: Unknown / This will be discussed at the kickoff meeting
Material Provisioning and Pricing Structure (PWS Section 2.1, Section 3.0 Task 2) Task 2 states the Contractor is responsible for "providing hardware and software." Section 2.1 states invoices will be billed as individual line items per the price schedule.
- Please explicitly confirm if "providing" refers only to the labor of installing and configuring materials, and that all hardware components and software licenses will be Government-Furnished Property (GFP).
- Answer: Unknown / This will be discussed at the kickoff meeting
- If the contractor must purchase the hardware/software, is this material cost intended to be absorbed into the firm-fixed-price labor rate, or will the price schedule include a separate materials/parts CLIN billed at cost or on a not-to-exceed basis?
- Answer: Unknown / This will be discussed at the kickoff meeting
- If material is contractor-furnished, would VA authorize vendors to purchase Delta material directly against Delta's GSA MAS schedule (47QSMS24D0003) under FAR 51.1/52.251-1, billed as the materials line item(s) in Section 2.1? This would keep material sourcing within the contractor's existing responsibility while crediting the spend to the SDVOSB award.
- Answer: Unknown / This will be discussed at the kickoff meeting
Third-Party Integration Boundaries (Section III) The RFI requires the contractor to "Coordinate support for integrated systems or buildings not directly under Contractor control" and provide "limited third-party validation and troubleshooting."
- Will the VA define the scope boundary or place a labor hour cap on "limited third-party validation" before such troubleshooting must be handled as an out-of-scope equitable adjustment?
- Answer: Unknown / This will be discussed at the kickoff meeting
Delta Certification Pathway (PWS Section 2) Section 2 requires the Contractor be certified to operate on Delta Controls with record of completion of the Fundamental Technical Certification Exam. Research indicates this training and certification is only accessible through Delta's authorized Partner network, with no open enrollment path for non-Partner firms. Under FAR 11.002(a)(1)(ii), specifications cannot be unduly restrictive to competition.
- Has VA identified how a non-Delta-Partner firm is expected to satisfy this requirement given the closed OEM training channel?
- Answer: Unknown / This will be discussed at the kickoff meeting
- Given the substantial onsite cadence required in Section 1.5.c, subcontracting for certified Delta labor raises Limitations on Subcontracting concerns under SDVOSB set-aside rules (13 CFR 125.6), as the certified work would be performed primarily by the subcontractor rather than the prime. How does the VA intend to reconcile this?
- Answer: Unknown / This will be discussed at the kickoff meeting
- Would VA consider a certification grace period between award and required completion, or accept alternative proofs of equivalent BAS competency?
- Answer: Unknown / This will be discussed at the kickoff meeting
Security Clearances (Section 6) Section 6 states the contractor must reimburse the VA within 30 days for background investigations conducted by OPM.
- What is the exact fixed cost per individual background check that the VA will assess to the contractor so this can be accurately priced into our fixed-price proposal?
- Answer: Unknown / This will be discussed at the kickoff meeting
Analytics and Reporting (PWS Task 8) Task 8 requires quarterly status reports covering current status, needs, and recommendations.
- Beyond this quarterly narrative format, is VA interested in implementing any fault detection, alarm analytics, or centralized reporting capability across both campuses?
- Answer: Unknown / This will be discussed at the kickoff meeting
Travel
- Is there any established travel or per diem provision for contractor personnel, or is site coverage assumed to be locally based?
- Answer: Unknown / This will be discussed at the kickoff meeting
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- AMMENDMENT 0001 vanc por BAS.docx16 KB, August 11, 2026
- RFQ 36C26026Q0816.pdf455 KB, July 16, 2026
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Rjy Group LLC
- UEI
- N593JWU6B5A7
- CAGE
- 5YJ43
- Vendor location
- Houston, TX
- Contract
- 36C26026P0774, purchase order
- Obligated
- $230,235.20, current value $732,936
- Actions
- 1 between September 14, 2026 and September 14, 2026
- Competition
- Competed Under SAP, 1 offer received
- Set-aside reported
- Service Disabled Veteran Owned Small Business SET-ASIDE
- Described as
- Portland / Vancouver Building Automation Services Contract.
- Match
- solicitation number 36C26026Q0816 equals the FPDS solicitation identifier; same awarding office 36C260 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 16, 2026
Solicitation
Due August 7, 2026 at 7:30 PM EDT. SAM.gov, notice ace52c7be5b442c6b8f4c17a89b9a661
2 revisions on SAM
- July 16, 2026: publish, solicitation
- August 11, 2026: publish, special notice
August 11, 2026
Special notice, originally solicitation
Due August 28, 2026 at 7:30 PM EDT. SAM.gov, notice f780a3004ab947a79f68e6f98b06ff93
4 revisions on SAM
- August 20, 2026: publish, special notice
- August 20, 2026: publish, special notice
- July 16, 2026: publish, solicitation
- August 11, 2026: publish, special notice
August 20, 2026
Special notice
Due August 28, 2026 at 7:30 PM EDT. SAM.gov, notice 736c8a34fbb14d4c8d51b651db02f171
4 revisions on SAM
- August 20, 2026: publish, special notice
- August 20, 2026: publish, special notice
- July 16, 2026: publish, solicitation
- August 11, 2026: publish, special notice
August 20, 2026
Special notice
Due August 28, 2026 at 7:30 PM EDT. SAM.gov, notice a914db26dc02447392c2d407804d978c
4 revisions on SAM
- August 20, 2026: publish, special notice
- August 20, 2026: publish, special notice
- July 16, 2026: publish, solicitation
- August 11, 2026: publish, special notice
Points of contact
- Jeremiah MiddletonJeremiah.Middleton2@va.gov2066584299