Skip to content
  • 6,816 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought, service-disabled veteran-owned small business set-aside

Van lift Gate Installation

36C25626Q0968

Department of Veterans Affairs, 256-Network Contract Office 16. All Other Automotive Repair and Maintenance.

Response deadline

June 29, 2026 at 1:00 PM EDT

Closed 124 days ago. Posted June 24, 2026. Scheduled to archive August 28, 2026.

Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities

Description

As published on SAM.gov.

Scope of Work (SOW) Lift Gate Installation for Sprinter Van Project Overview: The contractor shall provide all labor, materials, supervision, transportation, and equipment necessary to supply and install one (1) new 1,100-lb capacity hydraulic lift gate onto the designated Sprinter van. The installation must be conducted in accordance with all manufacturer specifications, safety standards, and applicable federal, state, and local regulations. Technical Requirements: Provide and install one (1) new rear-mounted hydraulic lift gate assembly. Minimum load capacity: 1,100 pounds. Lift gate must be compatible with the existing Sprinter van make and model. Provide all required hardware, wiring, brackets, hydraulic components, and fasteners. All electrical work shall comply with vehicle manufacturer guidelines and safety standards. Lift gate shall include corrosion-resistant materials suitable for coastal climates. Upon completion, perform full operational testing, safety verification, and functional load testing.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 24, 2026

    Sources sought

    Due June 29, 2026 at 1:00 PM EDT. SAM.gov, notice fdce69d251c34f378097cf693e5c0e44

    1 revisions on SAM
    • June 24, 2026: publish, sources sought

Points of contact